esVolta

Power developer9 projects on record Data as of

esVolta has 4 planned power projects totaling 504.4 MW and 5 operating projects totaling 595 MW in the FieldProspects database. 90% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 83 contacts at the company are on file.

504.4MW
planned, 4 projects
595MW
operating, 5 projects
454.4MW
interconnection agreement signed, 90% of planned
150MW
under construction, 1 project
0MW
past due, 0 projects
83
contacts on file
Map

Where esVolta's planned pipeline sits

Planned MW by state. The 2 largest states hold 504.4 MW of the 504.4 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas454.4 MW3 projects, 90% of planned
  2. Montana50 MW1 project, 10% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.8MW planned

for every MW esVolta operates today.

PlannedOperating
Battery Storage 504.4 MW
595 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage4504.4 MW5595 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed454.4 MW, 90%
3 of 4 planned projects (75%)
Under construction150 MW, 30%
1 of 4 planned projects (25%)
Past due0 MW, 0%
0 of 4 planned projects (0%)
0% of esVolta's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of esVolta's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300400 Snapshot year 2026 353.8 MW 2027 2028
View as table
YearProjectsMW
202600 MW
20273353.8 MW
20281150.6 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

esVolta's planned MW leans on ERCOT and NorthWestern Energy. ERCOT alone holds 90% of it.

Figure 2

Planned MW by grid operator

4 planned projects

ERCOT 454.4 MW 3 projects
NorthWestern Energy 50 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT3454.4 MW
NorthWestern Energy150 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2022 was the biggest year.

050100150200 153.8 MW 2022 2023
View as table
Queue yearProjectsMW
20221153.8 MW
20231150.6 MW
Source. 2 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in esVolta's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 150 MW
1
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: esVoltaChange: any 2 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
2 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when esVolta's pipeline moves.

Request access

esVolta against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. esVolta ranks 275 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
275 esVolta this page 4
504.4 MW
5
595 MW
1.18

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus esVolta

83 people at esVolta

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 31 managers and 23 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

83 contacts

C-Suite 4
Founder 1
Head 1
VP 12
Director 23
Manager 31
Senior 10
Entry 1
View as table
SeniorityContacts
C-Suite4
Founder1
Head1
VP12
Director23
Manager31
Senior10
Entry1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 83 contacts
PersonTitleDepartmentSeniorityContact
83 contacts at esVolta for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every esVolta project

All 9 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: esVoltaSort: MW, largest first 9 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
9 projects and 1.1 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 83 contacts.

Request access

Get alerts for esVolta

We email you when esVolta adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every esVolta project and the 83 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.