FieldProspects

Eolian Energy

Power developer27 projects on record Data as of

Eolian Energy has 23 planned power projects totaling 4 GW and 4 operating projects totaling 650 MW in the FieldProspects database. 90% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 45 contacts at the company are on file.

4GW
planned, 23 projects
650MW
operating, 4 projects
3.6GW
interconnection agreement signed, 90% of planned
200MW
under construction, 1 project
0MW
past due, 0 projects
45
contacts on file
Map

Where Eolian Energy's planned pipeline sits

Planned MW by state. The 5 largest states hold 4 GW of the 4 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas2.3 GW10 projects, 57% of planned
  2. Oklahoma700 MW6 projects, 17% of planned
  3. Nebraska550 MW3 projects, 14% of planned
  4. Ohio400 MW2 projects, 10% of planned
  5. Missouri100 MW2 projects, 2% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
6.2MW planned

for every MW Eolian Energy operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 3.5 GW
650 MW
Solar 502.5 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage223.5 GW4650 MW
Solar1502.5 MW00 MW

MW by technologySolar has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed3.6 GW, 90%
21 of 23 planned projects (91%)
Under construction200 MW, 5%
1 of 23 planned projects (4%)
Past due0 MW, 0%
0 of 23 planned projects (0%)
0% of Eolian Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Eolian Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 501.4 MW 2026 2027 1.3 GW 2028 2029 2030
View as table
YearProjectsMW
20263501.4 MW
202751.1 GW
202891.3 GW
20294819.9 MW
20302350 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Eolian Energy's planned MW leans on ERCOT, Southwest Power Pool (SPP) and PJM Interconnection. ERCOT alone holds 52% of it.

Figure 2

Planned MW by grid operator

23 planned projects

ERCOT 2.1 GW 9 projects
Southwest Power Pool (SPP) 1.6 GW 12 projects
PJM Interconnection 400 MW 2 projects
View as table
GridPlanned projectsPlanned MW
ERCOT92.1 GW
Southwest Power Pool (SPP)121.6 GW
PJM Interconnection2400 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2021 was the biggest year.

05001k1.5k 2018 2019 2020 1.1 GW 2021 2022 2023 2024
View as table
Queue yearProjectsMW
20186650 MW
20192350.8 MW
20202359.9 MW
202171.1 GW
20222713.2 MW
202300 MW
20242457.5 MW
Source. 2 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Eolian Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
4
came online
1
cancelled, inactive or dropped
2
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Eolian EnergyChange: any 8 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
8 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Eolian Energy's pipeline moves.

Request access

Eolian Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Eolian Energy ranks 41 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
41 Eolian Energy this page 23
4 GW
4
650 MW
0.16

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Eolian Energy

45 people at Eolian Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 12 managers and 1 director are where interconnection and procurement decisions start.

Figure 4

By seniority

45 contacts

C-Suite 6
Head 3
VP 18
Director 1
Manager 12
Senior 5
View as table
SeniorityContacts
C-Suite6
Head3
VP18
Director1
Manager12
Senior5
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 45 contacts
PersonTitleDepartmentSeniorityContact
45 contacts at Eolian Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Eolian Energy project

All 27 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Eolian EnergySort: MW, largest first 27 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
27 projects and 4.7 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 45 contacts.

Request access

Get alerts for Eolian Energy

We email you when Eolian Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Eolian Energy project and the 45 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.