Eolian Energy
Eolian Energy has 23 planned power projects totaling 4 GW and 4 operating projects totaling 650 MW in the FieldProspects database. 90% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 45 contacts at the company are on file.
Where Eolian Energy's planned pipeline sits
Planned MW by state. The 5 largest states hold 4 GW of the 4 GW.
for every MW Eolian Energy operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 22 | 3.5 GW | 4 | 650 MW |
| Solar | 1 | 502.5 MW | 0 | 0 MW |
MW by technologySolar has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Eolian Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 3 | 501.4 MW |
| 2027 | 5 | 1.1 GW |
| 2028 | 9 | 1.3 GW |
| 2029 | 4 | 819.9 MW |
| 2030 | 2 | 350 MW |
Pipeline by grid and queue year
Eolian Energy's planned MW leans on ERCOT, Southwest Power Pool (SPP) and PJM Interconnection. ERCOT alone holds 52% of it.
Planned MW by grid operator
23 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 9 | 2.1 GW |
| Southwest Power Pool (SPP) | 12 | 1.6 GW |
| PJM Interconnection | 2 | 400 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2021 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2018 | 6 | 650 MW |
| 2019 | 2 | 350.8 MW |
| 2020 | 2 | 359.9 MW |
| 2021 | 7 | 1.1 GW |
| 2022 | 2 | 713.2 MW |
| 2023 | 0 | 0 MW |
| 2024 | 2 | 457.5 MW |
Changes since the June 4, 2026 snapshot
What moved in Eolian Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Eolian Energy's pipeline moves.
Eolian Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Eolian Energy ranks 41 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 41 | Eolian Energy this page | 23 | 4 | 0.16 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Eolian Energy45 people at Eolian Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 12 managers and 1 director are where interconnection and procurement decisions start.
By seniority
45 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 6 |
| Head | 3 |
| VP | 18 |
| Director | 1 |
| Manager | 12 |
| Senior | 5 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Eolian Energy project
All 27 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 45 contacts.
Get alerts for Eolian Energy
We email you when Eolian Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Eolian Energy project and the 45 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.