Entergy
Entergy has 13 planned power projects totaling 2.5 GW and 2 operating projects totaling 149 MW in the FieldProspects database. 15% of the planned capacity has an interconnection agreement and 15% is past its listed in-service date. The projects sit in 5 states and 2 technologies.
Where Entergy's planned pipeline sits
Planned MW by state. The 5 largest states hold 2.5 GW of the 2.5 GW.
Largest states
- Arkansas1.3 GW4 projects, 50% of planned
- Louisiana687.7 MW5 projects, 27% of planned
- Texas311 MW2 projects, 12% of planned
- Mississippi190 MW1 project, 8% of planned
- Wisconsin75 MW1 project, 3% of planned
for every MW Entergy operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 10 | 2 GW | 2 | 149 MW |
| Battery Storage | 3 | 557.7 MW | 0 | 0 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Entergy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2021 | 1 | 100 MW |
| 2022 | 1 | 200 MW |
| 2023 | 1 | 75 MW |
| 2024 | 0 | 0 MW |
| 2025 | 0 | 0 MW |
| 2026 | 0 | 0 MW |
| 2027 | 2 | 87.7 MW |
| 2028 | 3 | 590 MW |
| 2029 | 5 | 1.5 GW |
Pipeline by grid and queue year
Entergy's planned MW sits entirely in Midcontinent ISO (MISO).
Planned MW by grid operator
13 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Midcontinent ISO (MISO) | 13 | 2.5 GW |
When the planned projects entered the queue
Planned MW by queue request year. 2017 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2017 | 2 | 300 MW |
| 2018 | 1 | 75 MW |
Changes since the June 4, 2026 snapshot
What moved in Entergy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Entergy's pipeline moves.
Entergy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Entergy ranks 66 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 66 | Entergy this page | 13 | 2 | 0.06 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus EntergyEvery Entergy project
All 15 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Entergy
We email you when Entergy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Entergy project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.