FieldProspects

Enlight Renewable Energy

Power developer3 projects on record Data as of

Enlight Renewable Energy has 1 planned power project totaling 800 MW and 2 operating projects totaling 380 MW in the FieldProspects database. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 3 states and 2 technologies.

800MW
planned, 1 project
380MW
operating, 2 projects
0MW
interconnection agreement signed, 0% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
3
states
Map

Where Enlight Renewable Energy's planned pipeline sits

Planned MW by state. Everything sits in Oregon.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Oregon800 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
2.1MW planned

for every MW Enlight Renewable Energy operates today. Solar is most of the gap.

PlannedOperating
Solar 800 MW
80 MW
Battery Storage none
300 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar1800 MW180 MW
Battery Storage00 MW1300 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed0 MW, 0%
0 of 1 planned project (0%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due0 MW, 0%
0 of 1 planned project (0%)
None of Enlight Renewable Energy's planned MW sits in the seven ISO queues, where 11% of planned MW is past due across all developers.

Share of Enlight Renewable Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600800 Snapshot year 2026 2027 2028 2029 2030 800 MW 2031
View as table
YearProjectsMW
202600 MW
202700 MW
202800 MW
202900 MW
203000 MW
20311800 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Enlight Renewable Energy's planned MW sits entirely in Bonneville Power Administration.

Figure 2

Planned MW by grid operator

1 planned project

Bonneville Power Administration 800 MW 1 project
View as table
GridPlanned projectsPlanned MW
Bonneville Power Administration1800 MW

Enlight Renewable Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Enlight Renewable Energy ranks 204 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
204 Enlight Renewable Energy this page 1
800 MW
2
380 MW
0.48

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Enlight Renewable Energy

Every Enlight Renewable Energy project

All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Enlight Renewable EnergySort: MW, largest first 3 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
3 projects and 1.2 GW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Enlight Renewable Energy

We email you when Enlight Renewable Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Enlight Renewable Energy project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.