FieldProspects

EnerSmart Storage

Power developer3 projects on record Data as of

EnerSmart Storage has 1 planned power project totaling 3 MW and 2 operating projects totaling 6 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 6 contacts at the company are on file.

3MW
planned, 1 project
6MW
operating, 2 projects
3MW
interconnection agreement signed, 100% of planned
3MW
under construction, 1 project
0MW
past due, 0 projects
6
contacts on file
Map

Where EnerSmart Storage's planned pipeline sits

Planned MW by state. Everything sits in California.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. California3 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.5MW planned

for every MW EnerSmart Storage operates today.

PlannedOperating
Battery Storage 3 MW
6 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage13 MW26 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed3 MW, 100%
1 of 1 planned project (100%)
Under construction3 MW, 100%
1 of 1 planned project (100%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of EnerSmart Storage's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of EnerSmart Storage's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0123 Snapshot year 3 MW 2026
View as table
YearProjectsMW
202613 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

EnerSmart Storage's planned MW sits entirely in California ISO (CAISO).

Figure 2

Planned MW by grid operator

1 planned project

California ISO (CAISO) 3 MW 1 project
View as table
GridPlanned projectsPlanned MW
California ISO (CAISO)13 MW

Changes since the June 4, 2026 snapshot

What moved in EnerSmart Storage's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: EnerSmart StorageChange: any 2 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
2 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when EnerSmart Storage's pipeline moves.

Request access

EnerSmart Storage against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. EnerSmart Storage ranks 778 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
778 EnerSmart Storage this page 1
3 MW
2
6 MW
2.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus EnerSmart Storage

6 people at EnerSmart Storage

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 5 managers are where interconnection and procurement decisions start.

Figure 3

By seniority

6 contacts

C-Suite 1
Manager 5
View as table
SeniorityContacts
C-Suite1
Manager5
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 6 contacts
PersonTitleDepartmentSeniorityContact
6 contacts at EnerSmart Storage for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every EnerSmart Storage project

All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: EnerSmart StorageSort: MW, largest first 3 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
3 projects and 9 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 6 contacts.

Request access

Get alerts for EnerSmart Storage

We email you when EnerSmart Storage adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every EnerSmart Storage project and the 6 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.