energyRe
energyRe has 15 planned power projects totaling 1.5 GW and 2 operating projects totaling 132 MW in the FieldProspects database. 49% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 32 contacts at the company are on file.
Where energyRe's planned pipeline sits
Planned MW by state. The 3 largest states hold 1.5 GW of the 1.5 GW.
Largest states
- South Carolina823.3 MW12 projects, 56% of planned
- Nebraska535 MW2 projects, 36% of planned
- Oklahoma113 MW1 project, 8% of planned
for every MW energyRe operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 11 | 748.4 MW | 1 | 66 MW |
| Solar + Storage (Hybrid) | 3 | 648 MW | 0 | 0 MW |
| Battery Storage | 1 | 74.9 MW | 1 | 66 MW |
MW by technologySolar + Storage (Hybrid) has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of energyRe's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 74.9 MW |
| 2027 | 6 | 434.5 MW |
| 2028 | 5 | 313.9 MW |
| 2029 | 2 | 328 MW |
| 2030 | 1 | 320 MW |
Pipeline by grid and queue year
energyRe's planned MW leans on Southwest Power Pool (SPP), Duke Energy Progress East and Dominion Energy South Carolina. Southwest Power Pool (SPP) alone holds 44% of it.
Planned MW by grid operator
15 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Southwest Power Pool (SPP) | 3 | 648 MW |
| Duke Energy Progress East | 8 | 549.5 MW |
| Dominion Energy South Carolina | 3 | 199.8 MW |
| Santee Cooper (South Carolina Public Service Authority) | 1 | 74 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2020 | 3 | 648 MW |
Changes since the June 4, 2026 snapshot
What moved in energyRe's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when energyRe's pipeline moves.
energyRe against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. energyRe ranks 106 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 106 | energyRe this page | 15 | 2 | 0.09 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus energyRe32 people at energyRe
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 7 managers and 3 directors are where interconnection and procurement decisions start.
By seniority
32 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 5 |
| Founder | 1 |
| Partner | 1 |
| Head | 1 |
| VP | 13 |
| Director | 3 |
| Manager | 7 |
| Senior | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every energyRe project
All 17 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 32 contacts.
Get alerts for energyRe
We email you when energyRe adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every energyRe project and the 32 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.