FieldProspects

Energy Capital Group

Power developer1 project on record Data as of

Energy Capital Group has 1 planned power project totaling 300 MW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 1 contact at the company are on file.

300MW
planned, 1 project
0MW
operating, 0 projects
0MW
interconnection agreement signed, 0% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
1
contacts on file
Map

Where Energy Capital Group's planned pipeline sits

Planned MW by state. Everything sits in Utah.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Utah300 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
300 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 300 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar1300 MW00 MW

MW by technologySolar has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed0 MW, 0%
0 of 1 planned project (0%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due0 MW, 0%
0 of 1 planned project (0%)
None of Energy Capital Group's planned MW sits in the seven ISO queues, where 11% of planned MW is past due across all developers.

Share of Energy Capital Group's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300 Snapshot year 2026 300 MW 2027
View as table
YearProjectsMW
202600 MW
20271300 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Energy Capital Group's planned MW sits entirely in Los Angeles Department of Water & Power.

Figure 2

Planned MW by grid operator

1 planned project

Los Angeles Department of Water & Power 300 MW 1 project
View as table
GridPlanned projectsPlanned MW
Los Angeles Department of Water & Power1300 MW

Energy Capital Group against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Energy Capital Group ranks 405 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
405 Energy Capital Group this page 1
300 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Energy Capital Group

1 person at Energy Capital Group

Contacts with title, seniority, department, email and LinkedIn, counted here and never named.

Figure 3

By seniority

1 contact

Partner 1
View as table
SeniorityContacts
Partner1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 1 contact
PersonTitleDepartmentSeniorityContact
1 contact at Energy Capital Group for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Energy Capital Group project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Energy Capital GroupSort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 300 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 1 contact.

Request access

Get alerts for Energy Capital Group

We email you when Energy Capital Group adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Energy Capital Group project and the 1 person behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.