Energix

Power developer17 projects on record Data as of

Energix has 13 planned power projects totaling 935 MW and 4 operating projects totaling 78.8 MW in the FieldProspects database. 52% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 7 contacts at the company are on file.

935MW
planned, 13 projects
78.8MW
operating, 4 projects
488MW
interconnection agreement signed, 52% of planned
375MW
under construction, 5 projects
0MW
past due, 0 projects
7
contacts on file
Map

Where Energix's planned pipeline sits

Planned MW by state. The 3 largest states hold 935 MW of the 935 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Pennsylvania351.6 MW4 projects, 38% of planned
  2. Virginia343.4 MW7 projects, 37% of planned
  3. Ohio240 MW2 projects, 26% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
11.9MW planned

for every MW Energix operates today. Solar is most of the gap.

PlannedOperating
Solar 935 MW
78.8 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar13935 MW478.8 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed488 MW, 52%
7 of 13 planned projects (54%)
Under construction375 MW, 40%
5 of 13 planned projects (38%)
Past due0 MW, 0%
0 of 13 planned projects (0%)
0% of Energix's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Energix's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300400 Snapshot year 375 MW 2026 2027 2028 2029 2030 2031
View as table
YearProjectsMW
20265375 MW
20273215 MW
20283232 MW
202900 MW
203000 MW
20312113 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Energix's planned MW sits entirely in PJM Interconnection.

Figure 2

Planned MW by grid operator

13 planned projects

PJM Interconnection 935 MW 13 projects
View as table
GridPlanned projectsPlanned MW
PJM Interconnection13935 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2018 was the biggest year.

050100150200 170 MW 2018 2019
View as table
Queue yearProjectsMW
20182170 MW
20193148 MW
Source. 8 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Energix's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
3
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: EnergixChange: any 3 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
3 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Energix's pipeline moves.

Request access

Energix against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Energix ranks 182 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
182 Energix this page 13
935 MW
4
78.8 MW
0.08

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Energix

7 people at Energix

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 5 managers and 1 director are where interconnection and procurement decisions start.

Figure 4

By seniority

7 contacts

Director 1
Manager 5
Senior 1
View as table
SeniorityContacts
Director1
Manager5
Senior1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 7 contacts
PersonTitleDepartmentSeniorityContact
7 contacts at Energix for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Energix project

All 17 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: EnergixSort: MW, largest first 17 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
17 projects and 1 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 7 contacts.

Request access

Get alerts for Energix

We email you when Energix adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Energix project and the 7 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.