Power developer44 projects on record Data as of

Enel has 28 planned power projects totaling 5 GW and 16 operating projects totaling 2.2 GW in the FieldProspects database. 81% of the planned capacity has an interconnection agreement and 14% is past its listed in-service date. 19 contacts at the company are on file.

5GW
planned, 28 projects
2.2GW
operating, 16 projects
4GW
interconnection agreement signed, 81% of planned
100MW
under construction, 2 projects
718MW
past due, 4 projects
19
contacts on file
Map

Where Enel's planned pipeline sits

Planned MW by state. The 6 largest states hold 4.9 GW of the 5 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas3.2 GW15 projects, 63% of planned
  2. Ohio700 MW2 projects, 14% of planned
  3. Pennsylvania475.6 MW6 projects, 10% of planned
  4. Oklahoma305.9 MW2 projects, 6% of planned
  5. Missouri200 MW1 project, 4% of planned
  6. West Virginia80 MW1 project, 2% of planned

1 more state with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
2.3MW planned

for every MW Enel operates today. Solar is most of the gap.

PlannedOperating
Solar 3.7 GW
846.9 MW
Battery Storage 1.1 GW
711.1 MW
Solar + Storage (Hybrid) 150 MW
none
Wind none
613.1 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar213.7 GW4846.9 MW
Battery Storage51.1 GW9711.1 MW
Solar + Storage (Hybrid)2150 MW00 MW
Wind00 MW3613.1 MW

MW by technologySolar + Storage (Hybrid) has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed4 GW, 81%
24 of 28 planned projects (86%)
Under construction100 MW, 2%
2 of 28 planned projects (7%)
Past due718 MW, 14%
4 of 28 planned projects (14%)
14% of Enel's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Enel's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 2025 1.3 GW 2026 2027 1.4 GW 2028 2029 2030
View as table
YearProjectsMW
20254718 MW
202661.3 GW
20275630 MW
202891.4 GW
20292270 MW
20302700 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Enel's planned MW leans on ERCOT, PJM Interconnection and Southwest Power Pool (SPP). ERCOT alone holds 63% of it.

Figure 2

Planned MW by grid operator

28 planned projects

ERCOT 3.2 GW 15 projects
PJM Interconnection 1.3 GW 10 projects
Southwest Power Pool (SPP) 505.9 MW 3 projects
View as table
GridPlanned projectsPlanned MW
ERCOT153.2 GW
PJM Interconnection101.3 GW
Southwest Power Pool (SPP)3505.9 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2021 was the biggest year.

02505007501k 2017 2018 2019 2020 904.9 MW 2021 2022 2023 2024
View as table
Queue yearProjectsMW
20171141.1 MW
20181254 MW
20197695.6 MW
20204890 MW
20216904.9 MW
202200 MW
202300 MW
20244796.6 MW
Source. 5 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Enel's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
1
came online
0
cancelled, inactive or dropped
3
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: EnelChange: any 6 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
6 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Enel's pipeline moves.

Request access

Enel against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Enel ranks 34 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
34 Enel this page 28
5 GW
16
2.2 GW
0.43

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Enel

19 people at Enel

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 8 managers and 1 director are where interconnection and procurement decisions start.

Figure 4

By seniority

19 contacts

Partner 1
Head 3
Director 1
Manager 8
Senior 6
View as table
SeniorityContacts
Partner1
Head3
Director1
Manager8
Senior6
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 19 contacts
PersonTitleDepartmentSeniorityContact
19 contacts at Enel for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Enel project

All 44 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: EnelSort: MW, largest first 44 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
44 projects and 7.2 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 19 contacts.

Request access

Get alerts for Enel

We email you when Enel adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Enel project and the 19 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.