Enbridge
Enbridge has 16 planned power projects totaling 4.3 GW and 1 operating project totaling 401.4 MW in the FieldProspects database. 61% of the planned capacity has an interconnection agreement and 3% is past its listed in-service date. The projects sit in 5 states and 3 technologies.
Where Enbridge's planned pipeline sits
Planned MW by state. The 5 largest states hold 4.3 GW of the 4.3 GW.
for every MW Enbridge operates today. Wind is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Wind | 9 | 2 GW | 0 | 0 MW |
| Solar | 5 | 1.7 GW | 1 | 401.4 MW |
| Battery Storage | 2 | 600 MW | 0 | 0 MW |
MW by technologyWind and Battery Storage have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Enbridge's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2025 | 1 | 130 MW |
| 2026 | 4 | 1.3 GW |
| 2027 | 7 | 1.7 GW |
| 2028 | 2 | 800 MW |
| 2029 | 2 | 405 MW |
Pipeline by grid and queue year
Enbridge's planned MW leans on ERCOT, WAPA Rocky Mountain and PJM Interconnection. ERCOT alone holds 35% of it.
Planned MW by grid operator
16 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 6 | 1.5 GW |
| WAPA Rocky Mountain | 4 | 1.4 GW |
| PJM Interconnection | 3 | 877.5 MW |
| Southwest Power Pool (SPP) | 2 | 451.8 MW |
| Midcontinent ISO (MISO) | 1 | 130 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2017 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2017 | 2 | 451.8 MW |
| 2018 | 1 | 150 MW |
| 2019 | 2 | 435 MW |
| 2020 | 1 | 417.5 MW |
| 2021 | 0 | 0 MW |
| 2022 | 1 | 130 MW |
Enbridge against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Enbridge ranks 38 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 38 | Enbridge this page | 16 | 1 | 0.09 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus EnbridgeEvery Enbridge project
All 17 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Enbridge
We email you when Enbridge adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Enbridge project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.