Power developer17 projects on record Data as of

Enbridge has 16 planned power projects totaling 4.3 GW and 1 operating project totaling 401.4 MW in the FieldProspects database. 61% of the planned capacity has an interconnection agreement and 3% is past its listed in-service date. The projects sit in 5 states and 3 technologies.

4.3GW
planned, 16 projects
401.4MW
operating, 1 project
2.6GW
interconnection agreement signed, 61% of planned
1GW
under construction, 3 projects
130MW
past due, 1 project
5
states
Map

Where Enbridge's planned pipeline sits

Planned MW by state. The 5 largest states hold 4.3 GW of the 4.3 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas1.9 GW8 projects, 45% of planned
  2. Wyoming1.4 GW4 projects, 32% of planned
  3. Illinois622.5 MW2 projects, 14% of planned
  4. Indiana255 MW1 project, 6% of planned
  5. Minnesota130 MW1 project, 3% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
10.8MW planned

for every MW Enbridge operates today. Wind is most of the gap.

PlannedOperating
Wind 2 GW
none
Solar 1.7 GW
401.4 MW
Battery Storage 600 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Wind92 GW00 MW
Solar51.7 GW1401.4 MW
Battery Storage2600 MW00 MW

MW by technologyWind and Battery Storage have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed2.6 GW, 61%
10 of 16 planned projects (63%)
Under construction1 GW, 24%
3 of 16 planned projects (19%)
Past due130 MW, 3%
1 of 16 planned projects (6%)
4% of Enbridge's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Enbridge's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k2k Snapshot year 2025 1.3 GW 2026 1.7 GW 2027 2028 2029
View as table
YearProjectsMW
20251130 MW
202641.3 GW
202771.7 GW
20282800 MW
20292405 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Enbridge's planned MW leans on ERCOT, WAPA Rocky Mountain and PJM Interconnection. ERCOT alone holds 35% of it.

Figure 2

Planned MW by grid operator

16 planned projects

ERCOT 1.5 GW 6 projects
WAPA Rocky Mountain 1.4 GW 4 projects
PJM Interconnection 877.5 MW 3 projects
Southwest Power Pool (SPP) 451.8 MW 2 projects
Midcontinent ISO (MISO) 130 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT61.5 GW
WAPA Rocky Mountain41.4 GW
PJM Interconnection3877.5 MW
Southwest Power Pool (SPP)2451.8 MW
Midcontinent ISO (MISO)1130 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2017 was the biggest year.

0200400600 451.8 MW 2017 2018 2019 2020 2021 2022
View as table
Queue yearProjectsMW
20172451.8 MW
20181150 MW
20192435 MW
20201417.5 MW
202100 MW
20221130 MW
Source. 9 projects without a queue date are left out MW

Enbridge against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Enbridge ranks 38 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
38 Enbridge this page 16
4.3 GW
1
401.4 MW
0.09

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Enbridge

Every Enbridge project

All 17 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: EnbridgeSort: MW, largest first 17 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
17 projects and 4.7 GW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Enbridge

We email you when Enbridge adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Enbridge project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.