Elevate Renewables
Elevate Renewables has 2 planned power projects totaling 290.1 MW in the FieldProspects database and no operating project on record. 5% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 16 contacts at the company are on file.
Where Elevate Renewables' planned pipeline sits
Planned MW by state. The 2 largest states hold 290.1 MW of the 290.1 MW.
Largest states
- Connecticut275 MW1 project, 95% of planned
- New York15.1 MW1 project, 5% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 2 | 290.1 MW | 0 | 0 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Elevate Renewables' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 15.1 MW |
| 2027 | 1 | 275 MW |
Pipeline by grid and queue year
Elevate Renewables' planned MW leans on ISO New England and New York ISO (NYISO). ISO New England alone holds 95% of it.
Planned MW by grid operator
2 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ISO New England | 1 | 275 MW |
| New York ISO (NYISO) | 1 | 15.1 MW |
Changes since the June 4, 2026 snapshot
What moved in Elevate Renewables' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Elevate Renewables' pipeline moves.
Elevate Renewables against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Elevate Renewables ranks 414 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 414 | Elevate Renewables this page | 2 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Elevate Renewables16 people at Elevate Renewables
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 3 managers and 5 directors are where interconnection and procurement decisions start.
By seniority
16 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 2 |
| VP | 6 |
| Director | 5 |
| Manager | 3 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Elevate Renewables project
All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 16 contacts.
Get alerts for Elevate Renewables
We email you when Elevate Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Elevate Renewables project and the 16 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.