Power developer2 projects on record Data as of

Elawan has 1 planned power project totaling 252.3 MW and 1 operating project totaling 30.4 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 8 contacts at the company are on file.

252.3MW
planned, 1 project
30.4MW
operating, 1 project
252.3MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
8
contacts on file
Map

Where Elawan's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas252.3 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
8.3MW planned

for every MW Elawan operates today. Solar is most of the gap.

PlannedOperating
Solar 252.3 MW
30.4 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar1252.3 MW130.4 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed252.3 MW, 100%
1 of 1 planned project (100%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of Elawan's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Elawan's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300 Snapshot year 2026 2027 252.3 MW 2028
View as table
YearProjectsMW
202600 MW
202700 MW
20281252.3 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Elawan's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

1 planned project

ERCOT 252.3 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT1252.3 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2022 was the biggest year.

0100200300 252.3 MW 2022
View as table
Queue yearProjectsMW
20221252.3 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in Elawan's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
1
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: ElawanChange: any 2 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
2 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Elawan's pipeline moves.

Request access

Elawan against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Elawan ranks 426 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
426 Elawan this page 1
252.3 MW
1
30.4 MW
0.12

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Elawan

8 people at Elawan

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 4 managers and 3 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

8 contacts

C-Suite 1
Director 3
Manager 4
View as table
SeniorityContacts
C-Suite1
Director3
Manager4
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 8 contacts
PersonTitleDepartmentSeniorityContact
8 contacts at Elawan for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Elawan project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: ElawanSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 282.7 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 8 contacts.

Request access

Get alerts for Elawan

We email you when Elawan adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Elawan project and the 8 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.