FieldProspects

EDP Renewables

Power developer85 projects on record Data as of

EDP Renewables has 60 planned power projects totaling 9.3 GW and 25 operating projects totaling 3.5 GW in the FieldProspects database. 87% of the planned capacity has an interconnection agreement and 24% is past its listed in-service date. The projects sit in 17 states and 4 technologies.

9.3GW
planned, 60 projects
3.5GW
operating, 25 projects
8.1GW
interconnection agreement signed, 87% of planned
1.1GW
under construction, 8 projects
2.2GW
past due, 16 projects
17
states
Map

Where EDP Renewables' planned pipeline sits

Planned MW by state. The 6 largest states hold 7.5 GW of the 9.3 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Illinois2.4 GW8 projects, 26% of planned
  2. Indiana1.7 GW13 projects, 19% of planned
  3. California1.4 GW10 projects, 15% of planned
  4. Texas807.5 MW5 projects, 9% of planned
  5. Wisconsin647.5 MW4 projects, 7% of planned
  6. Michigan540 MW3 projects, 6% of planned

9 more states with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
2.7MW planned

for every MW EDP Renewables operates today. Solar is most of the gap.

PlannedOperating
Solar 5.1 GW
2.4 GW
Battery Storage 2.3 GW
701.6 MW
Wind 1.6 GW
401.7 MW
Solar + Storage (Hybrid) 300 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar355.1 GW172.4 GW
Battery Storage152.3 GW6701.6 MW
Wind91.6 GW2401.7 MW
Solar + Storage (Hybrid)1300 MW00 MW

MW by technologySolar + Storage (Hybrid) has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed8.1 GW, 87%
52 of 60 planned projects (87%)
Under construction1.1 GW, 11%
8 of 60 planned projects (13%)
Past due2.2 GW, 24%
16 of 60 planned projects (27%)
24% of EDP Renewables' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of EDP Renewables' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
01k2k3k Snapshot year 2021 2022 2023 2024 2025 1.8 GW 2026 2027 2028 2.6 GW 2029 2030 2031
View as table
YearProjectsMW
20211100 MW
20222300 MW
20233575 MW
2024150 MW
202591.2 GW
2026131.8 GW
2027101.3 GW
20285976 MW
2029142.6 GW
203000 MW
20312400 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

EDP Renewables' planned MW leans on PJM Interconnection, Midcontinent ISO (MISO) and California ISO (CAISO). PJM Interconnection alone holds 37% of it.

Figure 2

Planned MW by grid operator

60 planned projects

PJM Interconnection 3.4 GW 17 projects
Midcontinent ISO (MISO) 2.8 GW 21 projects
California ISO (CAISO) 1.5 GW 12 projects
ERCOT 807.5 MW 5 projects
Southwest Power Pool (SPP) 403.2 MW 2 projects
New York ISO (NYISO) 201.4 MW 2 projects
Avista 126 MW 1 project
View as table
GridPlanned projectsPlanned MW
PJM Interconnection173.4 GW
Midcontinent ISO (MISO)212.8 GW
California ISO (CAISO)121.5 GW
ERCOT5807.5 MW
Southwest Power Pool (SPP)2403.2 MW
New York ISO (NYISO)2201.4 MW
Avista1126 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

01k2k3k4k 2013 2014 2015 2016 2017 2018 2019 3.2 GW 2020 2021 2022
View as table
Queue yearProjectsMW
2013290 MW
201400 MW
201500 MW
201600 MW
2017101.5 GW
20186967.4 MW
2019132.1 GW
2020183.2 GW
2021150.9 MW
20221150.6 MW
Source. 9 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in EDP Renewables' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 100 MW
0
came online
1
cancelled, inactive or dropped
6
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: EDP RenewablesChange: any 9 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
9 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when EDP Renewables' pipeline moves.

Request access

EDP Renewables against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. EDP Renewables ranks 14 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
14 EDP Renewables this page 60
9.3 GW
25
3.5 GW
0.37

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus EDP Renewables

Every EDP Renewables project

All 85 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: EDP RenewablesSort: MW, largest first 85 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
85 projects and 12.8 GW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for EDP Renewables

We email you when EDP Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every EDP Renewables project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.