EDP Renewables
EDP Renewables has 60 planned power projects totaling 9.3 GW and 25 operating projects totaling 3.5 GW in the FieldProspects database. 87% of the planned capacity has an interconnection agreement and 24% is past its listed in-service date. The projects sit in 17 states and 4 technologies.
Where EDP Renewables' planned pipeline sits
Planned MW by state. The 6 largest states hold 7.5 GW of the 9.3 GW.
for every MW EDP Renewables operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 35 | 5.1 GW | 17 | 2.4 GW |
| Battery Storage | 15 | 2.3 GW | 6 | 701.6 MW |
| Wind | 9 | 1.6 GW | 2 | 401.7 MW |
| Solar + Storage (Hybrid) | 1 | 300 MW | 0 | 0 MW |
MW by technologySolar + Storage (Hybrid) has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of EDP Renewables' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2021 | 1 | 100 MW |
| 2022 | 2 | 300 MW |
| 2023 | 3 | 575 MW |
| 2024 | 1 | 50 MW |
| 2025 | 9 | 1.2 GW |
| 2026 | 13 | 1.8 GW |
| 2027 | 10 | 1.3 GW |
| 2028 | 5 | 976 MW |
| 2029 | 14 | 2.6 GW |
| 2030 | 0 | 0 MW |
| 2031 | 2 | 400 MW |
Pipeline by grid and queue year
EDP Renewables' planned MW leans on PJM Interconnection, Midcontinent ISO (MISO) and California ISO (CAISO). PJM Interconnection alone holds 37% of it.
Planned MW by grid operator
60 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 17 | 3.4 GW |
| Midcontinent ISO (MISO) | 21 | 2.8 GW |
| California ISO (CAISO) | 12 | 1.5 GW |
| ERCOT | 5 | 807.5 MW |
| Southwest Power Pool (SPP) | 2 | 403.2 MW |
| New York ISO (NYISO) | 2 | 201.4 MW |
| Avista | 1 | 126 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2013 | 2 | 90 MW |
| 2014 | 0 | 0 MW |
| 2015 | 0 | 0 MW |
| 2016 | 0 | 0 MW |
| 2017 | 10 | 1.5 GW |
| 2018 | 6 | 967.4 MW |
| 2019 | 13 | 2.1 GW |
| 2020 | 18 | 3.2 GW |
| 2021 | 1 | 50.9 MW |
| 2022 | 1 | 150.6 MW |
Changes since the June 4, 2026 snapshot
What moved in EDP Renewables' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when EDP Renewables' pipeline moves.
EDP Renewables against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. EDP Renewables ranks 14 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 14 | EDP Renewables this page | 60 | 25 | 0.37 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus EDP RenewablesEvery EDP Renewables project
All 85 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for EDP Renewables
We email you when EDP Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every EDP Renewables project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.