Ecos Energy
Ecos Energy has 1 planned power project totaling 2 MW and 2 operating projects totaling 2 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 64 contacts at the company are on file.
Where Ecos Energy's planned pipeline sits
Planned MW by state. Everything sits in Vermont.
Largest states
- Vermont2 MW1 project, 100% of planned
for every MW Ecos Energy operates today.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 1 | 2 MW | 2 | 2 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Ecos Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 2 MW |
Pipeline by grid and queue year
Ecos Energy's planned MW sits entirely in ISO New England.
Planned MW by grid operator
1 planned project
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ISO New England | 1 | 2 MW |
Ecos Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Ecos Energy ranks 780 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 780 | Ecos Energy this page | 1 | 2 | 1.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Ecos Energy64 people at Ecos Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 29 managers and 15 directors are where interconnection and procurement decisions start.
By seniority
64 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 3 |
| Partner | 1 |
| VP | 10 |
| Director | 15 |
| Manager | 29 |
| Senior | 6 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Ecos Energy project
All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 64 contacts.
Get alerts for Ecos Energy
We email you when Ecos Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Ecos Energy project and the 64 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.