Ecoplexus

Power developer5 projects on record Data as of

Ecoplexus has 4 planned power projects totaling 685 MW and 1 operating project totaling 1.2 MW in the FieldProspects database. 66% of the planned capacity has an interconnection agreement and 66% is past its listed in-service date. 20 contacts at the company are on file.

685MW
planned, 4 projects
1.2MW
operating, 1 project
450MW
interconnection agreement signed, 66% of planned
300MW
under construction, 1 project
450MW
past due, 2 projects
20
contacts on file
Map

Where Ecoplexus' planned pipeline sits

Planned MW by state. The 4 largest states hold 685 MW of the 685 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Louisiana300 MW1 project, 44% of planned
  2. Texas175 MW1 project, 26% of planned
  3. Illinois150 MW1 project, 22% of planned
  4. North Carolina60 MW1 project, 9% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
570.8MW planned

for every MW Ecoplexus operates today. Solar is most of the gap.

PlannedOperating
Solar 360 MW
1.2 MW
Solar + Storage (Hybrid) 325 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar2360 MW11.2 MW
Solar + Storage (Hybrid)2325 MW00 MW

MW by technologySolar + Storage (Hybrid) has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed450 MW, 66%
2 of 4 planned projects (50%)
Under construction300 MW, 44%
1 of 4 planned projects (25%)
Past due450 MW, 66%
2 of 4 planned projects (50%)
72% of Ecoplexus' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Ecoplexus' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 450 MW 2024 2025 2026 2027 2028
View as table
YearProjectsMW
20242450 MW
202500 MW
202600 MW
202700 MW
20282235 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Ecoplexus' planned MW leans on Midcontinent ISO (MISO), Southwest Power Pool (SPP) and Duke Energy Carolinas. Midcontinent ISO (MISO) alone holds 66% of it.

Figure 2

Planned MW by grid operator

4 planned projects

Midcontinent ISO (MISO) 450 MW 2 projects
Southwest Power Pool (SPP) 175 MW 1 project
Duke Energy Carolinas 60 MW 1 project
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)2450 MW
Southwest Power Pool (SPP)1175 MW
Duke Energy Carolinas160 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

0200400600 450 MW 2019 2020 2021 2022 2023
View as table
Queue yearProjectsMW
20192450 MW
202000 MW
202100 MW
202200 MW
20231175 MW
Source. 1 project without a queue date is left out MW

Ecoplexus against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Ecoplexus ranks 231 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
231 Ecoplexus this page 4
685 MW
1
1.2 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Ecoplexus

20 people at Ecoplexus

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 8 managers and 3 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

20 contacts

VP 4
Director 3
Manager 8
Senior 5
View as table
SeniorityContacts
VP4
Director3
Manager8
Senior5
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 20 contacts
PersonTitleDepartmentSeniorityContact
20 contacts at Ecoplexus for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Ecoplexus project

All 5 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: EcoplexusSort: MW, largest first 5 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
5 projects and 686.2 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 20 contacts.

Request access

Get alerts for Ecoplexus

We email you when Ecoplexus adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Ecoplexus project and the 20 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.