Ecoplexus
Ecoplexus has 4 planned power projects totaling 685 MW and 1 operating project totaling 1.2 MW in the FieldProspects database. 66% of the planned capacity has an interconnection agreement and 66% is past its listed in-service date. 20 contacts at the company are on file.
Where Ecoplexus' planned pipeline sits
Planned MW by state. The 4 largest states hold 685 MW of the 685 MW.
Largest states
- Louisiana300 MW1 project, 44% of planned
- Texas175 MW1 project, 26% of planned
- Illinois150 MW1 project, 22% of planned
- North Carolina60 MW1 project, 9% of planned
for every MW Ecoplexus operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 2 | 360 MW | 1 | 1.2 MW |
| Solar + Storage (Hybrid) | 2 | 325 MW | 0 | 0 MW |
MW by technologySolar + Storage (Hybrid) has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Ecoplexus' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2024 | 2 | 450 MW |
| 2025 | 0 | 0 MW |
| 2026 | 0 | 0 MW |
| 2027 | 0 | 0 MW |
| 2028 | 2 | 235 MW |
Pipeline by grid and queue year
Ecoplexus' planned MW leans on Midcontinent ISO (MISO), Southwest Power Pool (SPP) and Duke Energy Carolinas. Midcontinent ISO (MISO) alone holds 66% of it.
Planned MW by grid operator
4 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Midcontinent ISO (MISO) | 2 | 450 MW |
| Southwest Power Pool (SPP) | 1 | 175 MW |
| Duke Energy Carolinas | 1 | 60 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2019 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 2 | 450 MW |
| 2020 | 0 | 0 MW |
| 2021 | 0 | 0 MW |
| 2022 | 0 | 0 MW |
| 2023 | 1 | 175 MW |
Ecoplexus against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Ecoplexus ranks 231 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 231 | Ecoplexus this page | 4 | 1 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Ecoplexus20 people at Ecoplexus
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 8 managers and 3 directors are where interconnection and procurement decisions start.
By seniority
20 contacts
View as table
| Seniority | Contacts |
|---|---|
| VP | 4 |
| Director | 3 |
| Manager | 8 |
| Senior | 5 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Ecoplexus project
All 5 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 20 contacts.
Get alerts for Ecoplexus
We email you when Ecoplexus adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Ecoplexus project and the 20 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.