FieldProspects

East Kentucky Power

Power developer5 projects on record Data as of

East Kentucky Power has 3 planned power projects totaling 50 MW and 2 operating projects totaling 8 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 2 states and 1 technology.

50MW
planned, 3 projects
8MW
operating, 2 projects
50MW
interconnection agreement signed, 100% of planned
50MW
under construction, 3 projects
0MW
past due, 0 projects
2
states
Map

Where East Kentucky Power's planned pipeline sits

Planned MW by state. The 2 largest states hold 50 MW of the 50 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Kentucky40 MW1 project, 80% of planned
  2. Texas10 MW2 projects, 20% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
6.3MW planned

for every MW East Kentucky Power operates today. Solar is most of the gap.

PlannedOperating
Solar 50 MW
8 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar350 MW28 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed50 MW, 100%
3 of 3 planned projects (100%)
Under construction50 MW, 100%
3 of 3 planned projects (100%)
Past due0 MW, 0%
0 of 3 planned projects (0%)
0% of East Kentucky Power's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of East Kentucky Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
010203040 Snapshot year 10 MW 2026 40 MW 2027
View as table
YearProjectsMW
2026210 MW
2027140 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

East Kentucky Power's planned MW leans on PJM Interconnection and ERCOT. PJM Interconnection alone holds 80% of it.

Figure 2

Planned MW by grid operator

3 planned projects

PJM Interconnection 40 MW 1 project
ERCOT 10 MW 2 projects
View as table
GridPlanned projectsPlanned MW
PJM Interconnection140 MW
ERCOT210 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

010203040 40 MW 2019
View as table
Queue yearProjectsMW
2019140 MW
Source. 2 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in East Kentucky Power's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: East Kentucky PowerChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when East Kentucky Power's pipeline moves.

Request access

East Kentucky Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. East Kentucky Power ranks 683 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
683 East Kentucky Power this page 3
50 MW
2
8 MW
0.16

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus East Kentucky Power

Every East Kentucky Power project

All 5 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: East Kentucky PowerSort: MW, largest first 5 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
5 projects and 58 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for East Kentucky Power

We email you when East Kentucky Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every East Kentucky Power project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.