Eagle Solar Group
Eagle Solar Group has 1 planned power project totaling 50 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 100% is past its listed in-service date. The projects sit in 1 state and 1 technology.
Where Eagle Solar Group's planned pipeline sits
Planned MW by state. Everything sits in Louisiana.
Largest states
- Louisiana50 MW1 project, 100% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 1 | 50 MW | 0 | 0 MW |
MW by technologySolar has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Eagle Solar Group's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2020 | 1 | 50 MW |
| 2021 | 0 | 0 MW |
| 2022 | 0 | 0 MW |
| 2023 | 0 | 0 MW |
| 2024 | 0 | 0 MW |
| 2025 | 0 | 0 MW |
| 2026 | 0 | 0 MW |
Pipeline by grid and queue year
Eagle Solar Group's planned MW sits entirely in Midcontinent ISO (MISO).
Planned MW by grid operator
1 planned project
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Midcontinent ISO (MISO) | 1 | 50 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2016 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2016 | 1 | 50 MW |
Eagle Solar Group against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Eagle Solar Group ranks 684 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 684 | Eagle Solar Group this page | 1 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Eagle Solar GroupEvery Eagle Solar Group project
The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Eagle Solar Group
We email you when Eagle Solar Group adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Eagle Solar Group project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.