DSD Renewables
DSD Renewables has 8 planned power projects totaling 18.7 MW and 24 operating projects totaling 47.1 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 80 contacts at the company are on file.
Where DSD Renewables' planned pipeline sits
Planned MW by state. The 2 largest states hold 18.7 MW of the 18.7 MW.
Largest states
- California16.4 MW7 projects, 88% of planned
- New Jersey2.3 MW1 project, 12% of planned
for every MW DSD Renewables operates today.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 5 | 15.9 MW | 17 | 35.6 MW |
| Battery Storage | 3 | 2.8 MW | 7 | 11.5 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of DSD Renewables' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 8 | 18.7 MW |
Pipeline by grid and queue year
DSD Renewables' planned MW leans on California ISO (CAISO) and PJM Interconnection. California ISO (CAISO) alone holds 88% of it.
Planned MW by grid operator
8 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 7 | 16.4 MW |
| PJM Interconnection | 1 | 2.3 MW |
Changes since the June 4, 2026 snapshot
What moved in DSD Renewables' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when DSD Renewables' pipeline moves.
DSD Renewables against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. DSD Renewables ranks 730 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 730 | DSD Renewables this page | 8 | 24 | 2.52 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus DSD Renewables80 people at DSD Renewables
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 35 managers and 13 directors are where interconnection and procurement decisions start.
By seniority
80 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 3 |
| Owner | 1 |
| VP | 15 |
| Director | 13 |
| Manager | 35 |
| Senior | 12 |
| Unknown | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every DSD Renewables project
All 32 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 80 contacts.
Get alerts for DSD Renewables
We email you when DSD Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every DSD Renewables project and the 80 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.