Dominion Energy

Power developer46 projects on record Data as of

Dominion Energy has 35 planned power projects totaling 8.9 GW and 11 operating projects totaling 615 MW in the FieldProspects database. 89% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 3 states and 3 technologies.

8.9GW
planned, 35 projects
615MW
operating, 11 projects
7.9GW
interconnection agreement signed, 89% of planned
7.2GW
under construction, 24 projects
0MW
past due, 0 projects
3
states
Map

Where Dominion Energy's planned pipeline sits

Planned MW by state. Everything sits in Virginia.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Virginia8.9 GW35 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
14.5MW planned

for every MW Dominion Energy operates today. Wind is most of the gap.

PlannedOperating
Wind 5.1 GW
none
Solar 3.2 GW
615 MW
Battery Storage 632 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Wind45.1 GW00 MW
Solar243.2 GW11615 MW
Battery Storage7632 MW00 MW

MW by technologyWind and Battery Storage have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed7.9 GW, 89%
31 of 35 planned projects (89%)
Under construction7.2 GW, 81%
24 of 35 planned projects (69%)
Past due0 MW, 0%
0 of 35 planned projects (0%)
0% of Dominion Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Dominion Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
01k2k3k4k Snapshot year 589 MW 2026 3.2 GW 2027 2028 2029 2030 2031 2032
View as table
YearProjectsMW
202610589 MW
202763.2 GW
20284520 MW
20291100 MW
20304931.9 MW
20316626 MW
203243 GW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Dominion Energy's planned MW sits entirely in PJM Interconnection.

Figure 2

Planned MW by grid operator

35 planned projects

PJM Interconnection 8.9 GW 35 projects
View as table
GridPlanned projectsPlanned MW
PJM Interconnection358.9 GW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

01k2k3k4k 2017 2018 3.4 GW 2019 2020
View as table
Queue yearProjectsMW
20172173.9 MW
20182170 MW
201993.4 GW
20209966 MW
Source. 13 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Dominion Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 99.9 MW
0
came online
0
cancelled, inactive or dropped
6
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Dominion EnergyChange: any 8 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
8 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Dominion Energy's pipeline moves.

Request access

Dominion Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Dominion Energy ranks 16 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
16 Dominion Energy this page 35
8.9 GW
11
615 MW
0.07

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Dominion Energy

Every Dominion Energy project

All 46 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Dominion EnergySort: MW, largest first 46 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
46 projects and 9.6 GW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Dominion Energy

We email you when Dominion Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Dominion Energy project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.