Dimension Energy
Dimension Energy has 25 planned power projects totaling 90.9 MW and 41 operating projects totaling 174.7 MW in the FieldProspects database. 73% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 72 contacts at the company are on file.
Where Dimension Energy's planned pipeline sits
Planned MW by state. The 5 largest states hold 90.9 MW of the 90.9 MW.
Largest states
- Pennsylvania42 MW14 projects, 46% of planned
- Illinois27.5 MW6 projects, 30% of planned
- New York15 MW3 projects, 17% of planned
- Virginia5 MW1 project, 6% of planned
- New Jersey1.4 MW1 project, 2% of planned
for every MW Dimension Energy operates today.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 25 | 90.9 MW | 40 | 173.6 MW |
| Battery Storage | 0 | 0 MW | 1 | 1.1 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Dimension Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 11 | 46.5 MW |
| 2027 | 11 | 35.4 MW |
| 2028 | 3 | 9 MW |
Pipeline by grid and queue year
Dimension Energy's planned MW leans on PJM Interconnection, Midcontinent ISO (MISO) and New York ISO (NYISO). PJM Interconnection alone holds 53% of it.
Planned MW by grid operator
25 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 16 | 48.4 MW |
| Midcontinent ISO (MISO) | 6 | 27.5 MW |
| New York ISO (NYISO) | 3 | 15 MW |
Changes since the June 4, 2026 snapshot
What moved in Dimension Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Dimension Energy's pipeline moves.
Dimension Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Dimension Energy ranks 646 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 646 | Dimension Energy this page | 25 | 41 | 1.92 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Dimension Energy72 people at Dimension Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 40 managers and 13 directors are where interconnection and procurement decisions start.
By seniority
72 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 2 |
| Founder | 2 |
| VP | 11 |
| Director | 13 |
| Manager | 40 |
| Senior | 4 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Dimension Energy project
All 66 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 72 contacts.
Get alerts for Dimension Energy
We email you when Dimension Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Dimension Energy project and the 72 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.