Deriva Energy

Power developer14 projects on record Data as of

Deriva Energy has 14 planned power projects totaling 2 GW in the FieldProspects database and no operating project on record. 86% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 152 contacts at the company are on file.

2GW
planned, 14 projects
0MW
operating, 0 projects
1.7GW
interconnection agreement signed, 86% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
152
contacts on file
Map

Where Deriva Energy's planned pipeline sits

Planned MW by state. The 4 largest states hold 2 GW of the 2 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Illinois1 GW3 projects, 50% of planned
  2. Texas489.5 MW3 projects, 24% of planned
  3. Indiana400 MW2 projects, 20% of planned
  4. California120 MW6 projects, 6% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
2 GWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 1.5 GW
none
Wind 414.5 MW
none
Battery Storage 135 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar81.5 GW00 MW
Wind2414.5 MW00 MW
Battery Storage4135 MW00 MW

MW by technology3 technologies have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed1.7 GW, 86%
12 of 14 planned projects (86%)
Under construction0 MW, 0%
0 of 14 planned projects (0%)
Past due0 MW, 0%
0 of 14 planned projects (0%)
0% of Deriva Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Deriva Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
02505007501k Snapshot year 400 MW 2026 2027 2028 1 GW 2029
View as table
YearProjectsMW
20262400 MW
20278534.5 MW
2028175 MW
202931 GW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Deriva Energy's planned MW leans on PJM Interconnection, ERCOT and Midcontinent ISO (MISO). PJM Interconnection alone holds 50% of it.

Figure 2

Planned MW by grid operator

14 planned projects

PJM Interconnection 1 GW 3 projects
ERCOT 489.5 MW 3 projects
Midcontinent ISO (MISO) 400 MW 2 projects
California ISO (CAISO) 120 MW 6 projects
View as table
GridPlanned projectsPlanned MW
PJM Interconnection31 GW
ERCOT3489.5 MW
Midcontinent ISO (MISO)2400 MW
California ISO (CAISO)6120 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

05001k1.5k 2012 2013 2014 2015 2016 2017 2018 2019 1.2 GW 2020 2021 2022 2023 2024 2025
View as table
Queue yearProjectsMW
2012240 MW
2013240 MW
20141201.6 MW
201500 MW
201600 MW
201700 MW
201800 MW
20191200 MW
202041.2 GW
202100 MW
2022175 MW
202300 MW
202400 MW
20251212.9 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in Deriva Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
1
came online
2
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Deriva EnergyChange: any 4 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
4 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Deriva Energy's pipeline moves.

Request access

Deriva Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Deriva Energy ranks 77 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
77 Deriva Energy this page 14
2 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Deriva Energy

152 people at Deriva Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 67 managers and 43 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

152 contacts

C-Suite 3
Partner 1
Head 5
VP 3
Director 43
Manager 67
Senior 30
View as table
SeniorityContacts
C-Suite3
Partner1
Head5
VP3
Director43
Manager67
Senior30
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 152 contacts
PersonTitleDepartmentSeniorityContact
152 contacts at Deriva Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Deriva Energy project

All 14 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Deriva EnergySort: MW, largest first 14 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
14 projects and 2 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 152 contacts.

Request access

Get alerts for Deriva Energy

We email you when Deriva Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Deriva Energy project and the 152 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.