Deriva Energy
Deriva Energy has 14 planned power projects totaling 2 GW in the FieldProspects database and no operating project on record. 86% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 152 contacts at the company are on file.
Where Deriva Energy's planned pipeline sits
Planned MW by state. The 4 largest states hold 2 GW of the 2 GW.
Largest states
- Illinois1 GW3 projects, 50% of planned
- Texas489.5 MW3 projects, 24% of planned
- Indiana400 MW2 projects, 20% of planned
- California120 MW6 projects, 6% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 8 | 1.5 GW | 0 | 0 MW |
| Wind | 2 | 414.5 MW | 0 | 0 MW |
| Battery Storage | 4 | 135 MW | 0 | 0 MW |
MW by technology3 technologies have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Deriva Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 2 | 400 MW |
| 2027 | 8 | 534.5 MW |
| 2028 | 1 | 75 MW |
| 2029 | 3 | 1 GW |
Pipeline by grid and queue year
Deriva Energy's planned MW leans on PJM Interconnection, ERCOT and Midcontinent ISO (MISO). PJM Interconnection alone holds 50% of it.
Planned MW by grid operator
14 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 3 | 1 GW |
| ERCOT | 3 | 489.5 MW |
| Midcontinent ISO (MISO) | 2 | 400 MW |
| California ISO (CAISO) | 6 | 120 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2012 | 2 | 40 MW |
| 2013 | 2 | 40 MW |
| 2014 | 1 | 201.6 MW |
| 2015 | 0 | 0 MW |
| 2016 | 0 | 0 MW |
| 2017 | 0 | 0 MW |
| 2018 | 0 | 0 MW |
| 2019 | 1 | 200 MW |
| 2020 | 4 | 1.2 GW |
| 2021 | 0 | 0 MW |
| 2022 | 1 | 75 MW |
| 2023 | 0 | 0 MW |
| 2024 | 0 | 0 MW |
| 2025 | 1 | 212.9 MW |
Changes since the June 4, 2026 snapshot
What moved in Deriva Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Deriva Energy's pipeline moves.
Deriva Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Deriva Energy ranks 77 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 77 | Deriva Energy this page | 14 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Deriva Energy152 people at Deriva Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 67 managers and 43 directors are where interconnection and procurement decisions start.
By seniority
152 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 3 |
| Partner | 1 |
| Head | 5 |
| VP | 3 |
| Director | 43 |
| Manager | 67 |
| Senior | 30 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Deriva Energy project
All 14 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 152 contacts.
Get alerts for Deriva Energy
We email you when Deriva Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Deriva Energy project and the 152 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.