Cypress Creek Renewables has 52 planned power projects totaling 8.8 GW and 26 operating projects totaling 707 MW in the FieldProspects database. 42% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 169 contacts at the company are on file.
Where Cypress Creek Renewables' planned pipeline sits
Planned MW by state. The 6 largest states hold 8.3 GW of the 8.8 GW.
for every MW Cypress Creek Renewables operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 35 | 6.2 GW | 23 | 366.6 MW |
| Battery Storage | 17 | 2.7 GW | 3 | 340.4 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Cypress Creek Renewables' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 4 | 134.9 MW |
| 2027 | 16 | 1.8 GW |
| 2028 | 17 | 3.4 GW |
| 2029 | 13 | 2.8 GW |
| 2030 | 2 | 750 MW |
Pipeline by grid and queue year
Cypress Creek Renewables' planned MW leans on ERCOT, Midcontinent ISO (MISO) and New York ISO (NYISO). ERCOT alone holds 48% of it.
Planned MW by grid operator
52 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 17 | 4.3 GW |
| Midcontinent ISO (MISO) | 7 | 2.3 GW |
| New York ISO (NYISO) | 6 | 498 MW |
| Duke Energy Carolinas | 6 | 367 MW |
| Public Service Company of Colorado | 3 | 324.9 MW |
| Nevada Power (NV Energy) | 1 | 300 MW |
| Duke Energy Progress East | 4 | 272 MW |
| ISO New England | 1 | 168 MW |
| Bonneville Power Administration | 1 | 160 MW |
| PJM Interconnection | 5 | 135 MW |
| PacifiCorp West | 1 | 80 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2025 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2016 | 1 | 20 MW |
| 2017 | 0 | 0 MW |
| 2018 | 1 | 100 MW |
| 2019 | 1 | 140 MW |
| 2020 | 2 | 458.8 MW |
| 2021 | 1 | 102.8 MW |
| 2022 | 1 | 451.7 MW |
| 2023 | 4 | 825.9 MW |
| 2024 | 2 | 308.4 MW |
| 2025 | 4 | 916.8 MW |
Changes since the June 4, 2026 snapshot
What moved in Cypress Creek Renewables' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Cypress Creek Renewables' pipeline moves.
Cypress Creek Renewables against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Cypress Creek Renewables ranks 17 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 17 | Cypress Creek Renewables this page | 52 | 26 | 0.08 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Cypress Creek Renewables169 people at Cypress Creek Renewables
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 64 managers and 50 directors are where interconnection and procurement decisions start.
By seniority
169 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 8 |
| Owner | 1 |
| Partner | 2 |
| Head | 1 |
| VP | 15 |
| Director | 50 |
| Manager | 64 |
| Senior | 28 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Cypress Creek Renewables project
All 78 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 169 contacts.
Get alerts for Cypress Creek Renewables
We email you when Cypress Creek Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Cypress Creek Renewables project and the 169 people behind them.