Cubico

Power developer3 projects on record Data as of

Cubico has 2 planned power projects totaling 200 MW and 1 operating project totaling 100 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 100% is past its listed in-service date. 8 contacts at the company are on file.

200MW
planned, 2 projects
100MW
operating, 1 project
200MW
interconnection agreement signed, 100% of planned
100MW
under construction, 1 project
200MW
past due, 2 projects
8
contacts on file
Map

Where Cubico's planned pipeline sits

Planned MW by state. The 2 largest states hold 200 MW of the 200 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Arkansas100 MW1 project, 50% of planned
  2. Mississippi100 MW1 project, 50% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
2MW planned

for every MW Cubico operates today. Solar is most of the gap.

PlannedOperating
Solar 200 MW
100 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar2200 MW1100 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed200 MW, 100%
2 of 2 planned projects (100%)
Under construction100 MW, 50%
1 of 2 planned projects (50%)
Past due200 MW, 100%
2 of 2 planned projects (100%)
100% of Cubico's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Cubico's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 200 MW 2021 2022 2023 2024 2025 2026
View as table
YearProjectsMW
20212200 MW
202200 MW
202300 MW
202400 MW
202500 MW
202600 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Cubico's planned MW sits entirely in Midcontinent ISO (MISO).

Figure 2

Planned MW by grid operator

2 planned projects

Midcontinent ISO (MISO) 200 MW 2 projects
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)2200 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2016 was the biggest year.

050100150200 200 MW 2016
View as table
Queue yearProjectsMW
20162200 MW
Source. Every planned project has a queue date MW

Cubico against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Cubico ranks 511 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
511 Cubico this page 2
200 MW
1
100 MW
0.50

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Cubico

8 people at Cubico

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 5 managers are where interconnection and procurement decisions start.

Figure 4

By seniority

8 contacts

VP 3
Manager 5
View as table
SeniorityContacts
VP3
Manager5
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 8 contacts
PersonTitleDepartmentSeniorityContact
8 contacts at Cubico for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Cubico project

All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: CubicoSort: MW, largest first 3 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
3 projects and 300 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 8 contacts.

Request access

Get alerts for Cubico

We email you when Cubico adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Cubico project and the 8 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.