CS Energy
CS Energy has 5 planned power projects totaling 310 MW and 2 operating projects totaling 8 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 83 contacts at the company are on file.
Where CS Energy's planned pipeline sits
Planned MW by state. Everything sits in New York.
Largest states
- New York310 MW5 projects, 100% of planned
for every MW CS Energy operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 5 | 310 MW | 2 | 8 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of CS Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 3 | 60 MW |
| 2028 | 2 | 250 MW |
Pipeline by grid and queue year
CS Energy's planned MW sits entirely in New York ISO (NYISO).
Planned MW by grid operator
5 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| New York ISO (NYISO) | 5 | 310 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 2 | 40 MW |
| 2020 | 2 | 180 MW |
| 2021 | 1 | 90 MW |
Changes since the June 4, 2026 snapshot
What moved in CS Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when CS Energy's pipeline moves.
CS Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. CS Energy ranks 380 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 380 | CS Energy this page | 5 | 2 | 0.03 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus CS Energy83 people at CS Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 42 managers and 10 directors are where interconnection and procurement decisions start.
By seniority
83 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 4 |
| VP | 11 |
| Director | 10 |
| Manager | 42 |
| Senior | 16 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every CS Energy project
All 7 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 83 contacts.
Get alerts for CS Energy
We email you when CS Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every CS Energy project and the 83 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.