FieldProspects

CS Energy

Power developer7 projects on record Data as of

CS Energy has 5 planned power projects totaling 310 MW and 2 operating projects totaling 8 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 83 contacts at the company are on file.

310MW
planned, 5 projects
8MW
operating, 2 projects
310MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
83
contacts on file
Map

Where CS Energy's planned pipeline sits

Planned MW by state. Everything sits in New York.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. New York310 MW5 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
38.8MW planned

for every MW CS Energy operates today. Solar is most of the gap.

PlannedOperating
Solar 310 MW
8 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar5310 MW28 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed310 MW, 100%
5 of 5 planned projects (100%)
Under construction0 MW, 0%
0 of 5 planned projects (0%)
Past due0 MW, 0%
0 of 5 planned projects (0%)
0% of CS Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of CS Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300 Snapshot year 2026 2027 250 MW 2028
View as table
YearProjectsMW
202600 MW
2027360 MW
20282250 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

CS Energy's planned MW sits entirely in New York ISO (NYISO).

Figure 2

Planned MW by grid operator

5 planned projects

New York ISO (NYISO) 310 MW 5 projects
View as table
GridPlanned projectsPlanned MW
New York ISO (NYISO)5310 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

050100150200 2019 180 MW 2020 2021
View as table
Queue yearProjectsMW
2019240 MW
20202180 MW
2021190 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in CS Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: CS EnergyChange: any 2 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
2 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when CS Energy's pipeline moves.

Request access

CS Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. CS Energy ranks 380 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
380 CS Energy this page 5
310 MW
2
8 MW
0.03

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus CS Energy

83 people at CS Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 42 managers and 10 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

83 contacts

C-Suite 4
VP 11
Director 10
Manager 42
Senior 16
View as table
SeniorityContacts
C-Suite4
VP11
Director10
Manager42
Senior16
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 83 contacts
PersonTitleDepartmentSeniorityContact
83 contacts at CS Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every CS Energy project

All 7 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: CS EnergySort: MW, largest first 7 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
7 projects and 318 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 83 contacts.

Request access

Get alerts for CS Energy

We email you when CS Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every CS Energy project and the 83 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.