Copia Power

Power developer15 projects on record Data as of

Copia Power has 7 planned power projects totaling 2 GW and 8 operating projects totaling 1.8 GW in the FieldProspects database. 41% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 46 contacts at the company are on file.

2GW
planned, 7 projects
1.8GW
operating, 8 projects
805.7MW
interconnection agreement signed, 41% of planned
805.7MW
under construction, 3 projects
0MW
past due, 0 projects
46
contacts on file
Map

Where Copia Power's planned pipeline sits

Planned MW by state. Everything sits in Arizona.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Arizona2 GW7 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
1.1MW planned

for every MW Copia Power operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 1.2 GW
478 MW
Solar 746.7 MW
1.3 GW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage41.2 GW3478 MW
Solar3746.7 MW51.3 GW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed805.7 MW, 41%
3 of 7 planned projects (43%)
Under construction805.7 MW, 41%
3 of 7 planned projects (43%)
Past due0 MW, 0%
0 of 7 planned projects (0%)
0% of Copia Power's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Copia Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 1.1 GW 2026 2027 2028
View as table
YearProjectsMW
202651.1 GW
202700 MW
20282821.5 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Copia Power's planned MW leans on California ISO (CAISO) and Arizona Public Service. California ISO (CAISO) alone holds 59% of it.

Figure 2

Planned MW by grid operator

7 planned projects

California ISO (CAISO) 1.2 GW 4 projects
Arizona Public Service 805.7 MW 3 projects
View as table
GridPlanned projectsPlanned MW
California ISO (CAISO)41.2 GW
Arizona Public Service3805.7 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2021 was the biggest year.

05001k1.5k 1.2 GW 2021
View as table
Queue yearProjectsMW
202141.2 GW
Source. 3 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Copia Power's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
7
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Copia PowerChange: any 7 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
7 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Copia Power's pipeline moves.

Request access

Copia Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Copia Power ranks 84 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
84 Copia Power this page 7
2 GW
8
1.8 GW
0.93

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Copia Power

46 people at Copia Power

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 14 managers and 19 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

46 contacts

C-Suite 8
Head 2
VP 1
Director 19
Manager 14
Senior 2
View as table
SeniorityContacts
C-Suite8
Head2
VP1
Director19
Manager14
Senior2
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 46 contacts
PersonTitleDepartmentSeniorityContact
46 contacts at Copia Power for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Copia Power project

All 15 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Copia PowerSort: MW, largest first 15 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
15 projects and 3.8 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 46 contacts.

Request access

Get alerts for Copia Power

We email you when Copia Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Copia Power project and the 46 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.