Copia Power
Copia Power has 7 planned power projects totaling 2 GW and 8 operating projects totaling 1.8 GW in the FieldProspects database. 41% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 46 contacts at the company are on file.
Where Copia Power's planned pipeline sits
Planned MW by state. Everything sits in Arizona.
Largest states
- Arizona2 GW7 projects, 100% of planned
for every MW Copia Power operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 4 | 1.2 GW | 3 | 478 MW |
| Solar | 3 | 746.7 MW | 5 | 1.3 GW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Copia Power's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 5 | 1.1 GW |
| 2027 | 0 | 0 MW |
| 2028 | 2 | 821.5 MW |
Pipeline by grid and queue year
Copia Power's planned MW leans on California ISO (CAISO) and Arizona Public Service. California ISO (CAISO) alone holds 59% of it.
Planned MW by grid operator
7 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 4 | 1.2 GW |
| Arizona Public Service | 3 | 805.7 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2021 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2021 | 4 | 1.2 GW |
Changes since the June 4, 2026 snapshot
What moved in Copia Power's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Copia Power's pipeline moves.
Copia Power against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Copia Power ranks 84 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 84 | Copia Power this page | 7 | 8 | 0.93 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Copia Power46 people at Copia Power
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 14 managers and 19 directors are where interconnection and procurement decisions start.
By seniority
46 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 8 |
| Head | 2 |
| VP | 1 |
| Director | 19 |
| Manager | 14 |
| Senior | 2 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Copia Power project
All 15 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 46 contacts.
Get alerts for Copia Power
We email you when Copia Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Copia Power project and the 46 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.