Copenhagen Infrastructure Partners

Power developer7 projects on record Data as of

Copenhagen Infrastructure Partners has 7 planned power projects totaling 2.2 GW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 25 contacts at the company are on file.

2.2GW
planned, 7 projects
0MW
operating, 0 projects
2.2GW
interconnection agreement signed, 100% of planned
1.9GW
under construction, 5 projects
0MW
past due, 0 projects
25
contacts on file
Map

Where Copenhagen Infrastructure Partners' planned pipeline sits

Planned MW by state. The 3 largest states hold 2.2 GW of the 2.2 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Illinois1.9 GW5 projects, 84% of planned
  2. Michigan200 MW1 project, 9% of planned
  3. Texas162.1 MW1 project, 7% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
2.2 GWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Wind 2 GW
none
Battery Storage 200 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Wind62 GW00 MW
Battery Storage1200 MW00 MW

MW by technologyWind and Battery Storage have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed2.2 GW, 100%
7 of 7 planned projects (100%)
Under construction1.9 GW, 84%
5 of 7 planned projects (71%)
Past due0 MW, 0%
0 of 7 planned projects (0%)
0% of Copenhagen Infrastructure Partners' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Copenhagen Infrastructure Partners' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
02505007501k Snapshot year 585.1 MW 2026 950 MW 2027 2028
View as table
YearProjectsMW
20262585.1 MW
20273950 MW
20282700 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Copenhagen Infrastructure Partners' planned MW leans on PJM Interconnection, Midcontinent ISO (MISO) and ERCOT. PJM Interconnection alone holds 84% of it.

Figure 2

Planned MW by grid operator

7 planned projects

PJM Interconnection 1.9 GW 5 projects
Midcontinent ISO (MISO) 200 MW 1 project
ERCOT 162.1 MW 1 project
View as table
GridPlanned projectsPlanned MW
PJM Interconnection51.9 GW
Midcontinent ISO (MISO)1200 MW
ERCOT1162.1 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

0200400600800 2013 2014 2015 2016 2017 2018 800 MW 2019 2020 2021
View as table
Queue yearProjectsMW
20131162.1 MW
201400 MW
201500 MW
201600 MW
201700 MW
20182650 MW
20192800 MW
202000 MW
20211200 MW
Source. 1 project without a queue date is left out MW

Changes since the June 4, 2026 snapshot

What moved in Copenhagen Infrastructure Partners' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Copenhagen Infrastructure PartnersChange: any 3 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
3 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Copenhagen Infrastructure Partners' pipeline moves.

Request access

Copenhagen Infrastructure Partners against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Copenhagen Infrastructure Partners ranks 72 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
72 Copenhagen Infrastructure Partners this page 7
2.2 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Copenhagen Infrastructure Partners

25 people at Copenhagen Infrastructure Partners

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 8 managers and 6 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

25 contacts

Partner 3
VP 2
Director 6
Manager 8
Senior 6
View as table
SeniorityContacts
Partner3
VP2
Director6
Manager8
Senior6
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 25 contacts
PersonTitleDepartmentSeniorityContact
25 contacts at Copenhagen Infrastructure Partners for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Copenhagen Infrastructure Partners project

All 7 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Copenhagen Infrastructure PartnersSort: MW, largest first 7 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
7 projects and 2.2 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 25 contacts.

Request access

Get alerts for Copenhagen Infrastructure Partners

We email you when Copenhagen Infrastructure Partners adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Copenhagen Infrastructure Partners project and the 25 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.