Copenhagen Infrastructure Partners
Copenhagen Infrastructure Partners has 7 planned power projects totaling 2.2 GW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 25 contacts at the company are on file.
Where Copenhagen Infrastructure Partners' planned pipeline sits
Planned MW by state. The 3 largest states hold 2.2 GW of the 2.2 GW.
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Wind | 6 | 2 GW | 0 | 0 MW |
| Battery Storage | 1 | 200 MW | 0 | 0 MW |
MW by technologyWind and Battery Storage have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Copenhagen Infrastructure Partners' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 2 | 585.1 MW |
| 2027 | 3 | 950 MW |
| 2028 | 2 | 700 MW |
Pipeline by grid and queue year
Copenhagen Infrastructure Partners' planned MW leans on PJM Interconnection, Midcontinent ISO (MISO) and ERCOT. PJM Interconnection alone holds 84% of it.
Planned MW by grid operator
7 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 5 | 1.9 GW |
| Midcontinent ISO (MISO) | 1 | 200 MW |
| ERCOT | 1 | 162.1 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2019 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2013 | 1 | 162.1 MW |
| 2014 | 0 | 0 MW |
| 2015 | 0 | 0 MW |
| 2016 | 0 | 0 MW |
| 2017 | 0 | 0 MW |
| 2018 | 2 | 650 MW |
| 2019 | 2 | 800 MW |
| 2020 | 0 | 0 MW |
| 2021 | 1 | 200 MW |
Changes since the June 4, 2026 snapshot
What moved in Copenhagen Infrastructure Partners' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Copenhagen Infrastructure Partners' pipeline moves.
Copenhagen Infrastructure Partners against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Copenhagen Infrastructure Partners ranks 72 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 72 | Copenhagen Infrastructure Partners this page | 7 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Copenhagen Infrastructure Partners25 people at Copenhagen Infrastructure Partners
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 8 managers and 6 directors are where interconnection and procurement decisions start.
By seniority
25 contacts
View as table
| Seniority | Contacts |
|---|---|
| Partner | 3 |
| VP | 2 |
| Director | 6 |
| Manager | 8 |
| Senior | 6 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Copenhagen Infrastructure Partners project
All 7 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 25 contacts.
Get alerts for Copenhagen Infrastructure Partners
We email you when Copenhagen Infrastructure Partners adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Copenhagen Infrastructure Partners project and the 25 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.