Convergent Energy and Power
Convergent Energy and Power has 1 planned power project totaling 5 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 79 contacts at the company are on file.
Where Convergent Energy and Power's planned pipeline sits
Planned MW by state. Everything sits in New York.
Largest states
- New York5 MW1 project, 100% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 1 | 5 MW | 0 | 0 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Convergent Energy and Power's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 5 MW |
Pipeline by grid and queue year
Convergent Energy and Power's planned MW sits entirely in ISO New England.
Planned MW by grid operator
1 planned project
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ISO New England | 1 | 5 MW |
Changes since the June 4, 2026 snapshot
What moved in Convergent Energy and Power's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Convergent Energy and Power's pipeline moves.
Convergent Energy and Power against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Convergent Energy and Power ranks 765 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 765 | Convergent Energy and Power this page | 1 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Convergent Energy and Power79 people at Convergent Energy and Power
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 20 managers and 10 directors are where interconnection and procurement decisions start.
By seniority
79 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 4 |
| Founder | 1 |
| Head | 5 |
| VP | 21 |
| Director | 10 |
| Manager | 20 |
| Senior | 18 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Convergent Energy and Power project
The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 79 contacts.
Get alerts for Convergent Energy and Power
We email you when Convergent Energy and Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Convergent Energy and Power project and the 79 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.