ConnectGen

Power developer12 projects on record Data as of

ConnectGen has 12 planned power projects totaling 2.8 GW in the FieldProspects database and no operating project on record. 28% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 7 contacts at the company are on file.

2.8GW
planned, 12 projects
0MW
operating, 0 projects
760MW
interconnection agreement signed, 28% of planned
457MW
under construction, 2 projects
0MW
past due, 0 projects
7
contacts on file
Map

Where ConnectGen's planned pipeline sits

Planned MW by state. The 6 largest states hold 2.8 GW of the 2.8 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas743.4 MW4 projects, 27% of planned
  2. Nevada600 MW2 projects, 22% of planned
  3. New York540 MW3 projects, 20% of planned
  4. Wyoming504 MW1 project, 18% of planned
  5. Illinois202.5 MW1 project, 7% of planned
  6. Massachusetts170 MW1 project, 6% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
2.8 GWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 1.6 GW
none
Wind 706.5 MW
none
Battery Storage 490 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar71.6 GW00 MW
Wind2706.5 MW00 MW
Battery Storage3490 MW00 MW

MW by technology3 technologies have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed760 MW, 28%
4 of 12 planned projects (33%)
Under construction457 MW, 17%
2 of 12 planned projects (17%)
Past due0 MW, 0%
0 of 12 planned projects (0%)
0% of ConnectGen's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of ConnectGen's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 153.5 MW 2026 1.3 GW 2027 2028 2029
View as table
YearProjectsMW
20261153.5 MW
202771.3 GW
20281250 MW
202931.1 GW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

ConnectGen's planned MW leans on ERCOT, Nevada Power (NV Energy) and New York ISO (NYISO). ERCOT alone holds 27% of it.

Figure 2

Planned MW by grid operator

12 planned projects

ERCOT 743.4 MW 4 projects
Nevada Power (NV Energy) 600 MW 2 projects
New York ISO (NYISO) 540 MW 3 projects
WAPA Rocky Mountain 504 MW 1 project
Midcontinent ISO (MISO) 202.5 MW 1 project
ISO New England 170 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT4743.4 MW
Nevada Power (NV Energy)2600 MW
New York ISO (NYISO)3540 MW
WAPA Rocky Mountain1504 MW
Midcontinent ISO (MISO)1202.5 MW
ISO New England1170 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

0100200300400 303 MW 2019 2020 2021 2022
View as table
Queue yearProjectsMW
20192303 MW
202000 MW
202100 MW
20221153.5 MW
Source. 9 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in ConnectGen's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: ConnectGenChange: any 5 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
5 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when ConnectGen's pipeline moves.

Request access

ConnectGen against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. ConnectGen ranks 56 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
56 ConnectGen this page 12
2.8 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus ConnectGen

7 people at ConnectGen

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 3 managers and 2 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

7 contacts

VP 1
Director 2
Manager 3
Senior 1
View as table
SeniorityContacts
VP1
Director2
Manager3
Senior1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 7 contacts
PersonTitleDepartmentSeniorityContact
7 contacts at ConnectGen for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every ConnectGen project

All 12 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: ConnectGenSort: MW, largest first 12 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
12 projects and 2.8 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 7 contacts.

Request access

Get alerts for ConnectGen

We email you when ConnectGen adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every ConnectGen project and the 7 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.