Con Edison Development has 11 planned power projects totaling 1.4 GW and 12 operating projects totaling 1 GW in the FieldProspects database. 16% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 7 states and 4 technologies.
Where Con Edison Development's planned pipeline sits
Planned MW by state. The 5 largest states hold 1.4 GW of the 1.4 GW.
Largest states
- Texas1.1 GW5 projects, 74% of planned
- California225 MW2 projects, 16% of planned
- Nebraska75 MW1 project, 5% of planned
- Virginia70 MW1 project, 5% of planned
- New York0 MW2 projects, 0% of planned
for every MW Con Edison Development operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 4 | 820 MW | 5 | 694.5 MW |
| Battery Storage | 4 | 525 MW | 7 | 335.1 MW |
| Wind | 1 | 75 MW | 0 | 0 MW |
| Transmission | 2 | 0 MW | 0 | 0 MW |
MW by technologyWind and Transmission have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Con Edison Development's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 2 | 225 MW |
| 2027 | 4 | 675 MW |
| 2028 | 3 | 520 MW |
Pipeline by grid and queue year
Con Edison Development's planned MW leans on ERCOT, California ISO (CAISO) and Southwest Power Pool (SPP). ERCOT alone holds 74% of it.
Planned MW by grid operator
11 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 5 | 1.1 GW |
| California ISO (CAISO) | 2 | 225 MW |
| Southwest Power Pool (SPP) | 1 | 75 MW |
| PJM Interconnection | 1 | 70 MW |
| New York ISO (NYISO) | 2 | 0 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2022 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2021 | 2 | 150 MW |
| 2022 | 3 | 600 MW |
| 2023 | 0 | 0 MW |
| 2024 | 1 | 0 MW |
Changes since the June 4, 2026 snapshot
What moved in Con Edison Development's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Con Edison Development's pipeline moves.
Con Edison Development against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Con Edison Development ranks 109 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 109 | Con Edison Development this page | 11 | 12 | 0.73 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Con Edison DevelopmentEvery Con Edison Development project
All 23 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Con Edison Development
We email you when Con Edison Development adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Con Edison Development project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.