Competitive Power Ventures

Power developer8 projects on record Data as of

Competitive Power Ventures has 6 planned power projects totaling 1.1 GW and 2 operating projects totaling 255 MW in the FieldProspects database. 49% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 98 contacts at the company are on file.

1.1GW
planned, 6 projects
255MW
operating, 2 projects
516.9MW
interconnection agreement signed, 49% of planned
284.9MW
under construction, 2 projects
0MW
past due, 0 projects
98
contacts on file
Map

Where Competitive Power Ventures' planned pipeline sits

Planned MW by state. The 5 largest states hold 1.1 GW of the 1.1 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas394.1 MW1 project, 37% of planned
  2. Pennsylvania259.9 MW2 projects, 24% of planned
  3. Maryland175 MW1 project, 16% of planned
  4. Virginia150 MW1 project, 14% of planned
  5. Kentucky82 MW1 project, 8% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
4.2MW planned

for every MW Competitive Power Ventures operates today. Wind is most of the gap.

PlannedOperating
Solar 557 MW
255 MW
Wind 504 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar4557 MW2255 MW
Wind2504 MW00 MW

MW by technologyWind has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed516.9 MW, 49%
4 of 6 planned projects (67%)
Under construction284.9 MW, 27%
2 of 6 planned projects (33%)
Past due0 MW, 0%
0 of 6 planned projects (0%)
0% of Competitive Power Ventures' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Competitive Power Ventures' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 284.9 MW 2026 2027 2028 2029 544.1 MW 2030
View as table
YearProjectsMW
20262284.9 MW
202700 MW
202800 MW
20292232 MW
20302544.1 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Competitive Power Ventures' planned MW leans on PJM Interconnection and ERCOT. PJM Interconnection alone holds 63% of it.

Figure 2

Planned MW by grid operator

6 planned projects

PJM Interconnection 666.9 MW 5 projects
ERCOT 394.1 MW 1 project
View as table
GridPlanned projectsPlanned MW
PJM Interconnection5666.9 MW
ERCOT1394.1 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2026 was the biggest year.

0100200300400 2019 2020 2021 2022 2023 2024 2025 394.1 MW 2026
View as table
Queue yearProjectsMW
20192259.9 MW
20202257 MW
202100 MW
202200 MW
202300 MW
202400 MW
202500 MW
20261394.1 MW
Source. 1 project without a queue date is left out MW

Changes since the June 4, 2026 snapshot

What moved in Competitive Power Ventures' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 394.1 MW
0
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Competitive Power VenturesChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Competitive Power Ventures' pipeline moves.

Request access

Competitive Power Ventures against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Competitive Power Ventures ranks 158 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
158 Competitive Power Ventures this page 6
1.1 GW
2
255 MW
0.24

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Competitive Power Ventures

98 people at Competitive Power Ventures

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 18 managers and 31 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

98 contacts

C-Suite 4
VP 34
Director 31
Manager 18
Senior 10
Entry 1
View as table
SeniorityContacts
C-Suite4
VP34
Director31
Manager18
Senior10
Entry1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 98 contacts
PersonTitleDepartmentSeniorityContact
98 contacts at Competitive Power Ventures for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Competitive Power Ventures project

All 8 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Competitive Power VenturesSort: MW, largest first 8 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
8 projects and 1.3 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 98 contacts.

Request access

Get alerts for Competitive Power Ventures

We email you when Competitive Power Ventures adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Competitive Power Ventures project and the 98 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.