Clenera has 23 planned power projects totaling 5.6 GW and 4 operating projects totaling 930 MW in the FieldProspects database. 31% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 76 contacts at the company are on file.
Where Clenera's planned pipeline sits
Planned MW by state. The 6 largest states hold 5.2 GW of the 5.6 GW.
for every MW Clenera operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 13 | 3.3 GW | 3 | 695 MW |
| Battery Storage | 6 | 1.7 GW | 1 | 235 MW |
| Solar + Storage (Hybrid) | 4 | 524 MW | 0 | 0 MW |
MW by technologySolar + Storage (Hybrid) has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Clenera's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 2 | 516 MW |
| 2027 | 9 | 2.5 GW |
| 2028 | 9 | 1.5 GW |
| 2029 | 2 | 300 MW |
| 2030 | 1 | 800 MW |
Pipeline by grid and queue year
Clenera's planned MW leans on Arizona Public Service, PJM Interconnection and Balancing Authority of Northern California. Arizona Public Service alone holds 53% of it.
Planned MW by grid operator
23 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Arizona Public Service | 8 | 3 GW |
| PJM Interconnection | 6 | 1.3 GW |
| Balancing Authority of Northern California | 2 | 516 MW |
| Southwest Power Pool (SPP) | 2 | 335 MW |
| Midcontinent ISO (MISO) | 3 | 300 MW |
| Idaho Power | 2 | 200 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2018 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2018 | 1 | 800 MW |
| 2019 | 0 | 0 MW |
| 2020 | 3 | 339 MW |
| 2021 | 0 | 0 MW |
| 2022 | 0 | 0 MW |
| 2023 | 2 | 335 MW |
Changes since the June 4, 2026 snapshot
What moved in Clenera's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Clenera's pipeline moves.
Clenera against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Clenera ranks 30 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 30 | Clenera this page | 23 | 4 | 0.17 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Clenera76 people at Clenera
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 38 managers and 10 directors are where interconnection and procurement decisions start.
By seniority
76 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 4 |
| Founder | 1 |
| Partner | 1 |
| Head | 1 |
| VP | 10 |
| Director | 10 |
| Manager | 38 |
| Senior | 11 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Clenera project
All 27 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 76 contacts.
Get alerts for Clenera
We email you when Clenera adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Clenera project and the 76 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.