Clearway
Clearway has 24 planned power projects totaling 6.7 GW and 15 operating projects totaling 2.5 GW in the FieldProspects database. 75% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 245 contacts at the company are on file.
Where Clearway's planned pipeline sits
Planned MW by state. The 5 largest states hold 6.7 GW of the 6.7 GW.
Largest states
- Texas3.1 GW14 projects, 47% of planned
- Nevada1.8 GW4 projects, 27% of planned
- Kansas875 MW2 projects, 13% of planned
- Washington520 MW2 projects, 8% of planned
- California372.5 MW2 projects, 6% of planned
for every MW Clearway operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 10 | 2.4 GW | 7 | 843.5 MW |
| Solar | 8 | 2.3 GW | 7 | 1.5 GW |
| Wind | 4 | 1.1 GW | 1 | 160 MW |
| Solar + Storage (Hybrid) | 2 | 875 MW | 0 | 0 MW |
MW by technologySolar + Storage (Hybrid) has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Clearway's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 4 | 1.3 GW |
| 2027 | 5 | 1 GW |
| 2028 | 8 | 2 GW |
| 2029 | 7 | 2.4 GW |
Pipeline by grid and queue year
Clearway's planned MW leans on ERCOT, California ISO (CAISO) and Southwest Power Pool (SPP). ERCOT alone holds 44% of it.
Planned MW by grid operator
24 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 13 | 2.9 GW |
| California ISO (CAISO) | 6 | 2.2 GW |
| Southwest Power Pool (SPP) | 2 | 875 MW |
| Bonneville Power Administration | 2 | 520 MW |
| Douglas County PUD | 1 | 200 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2021 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2015 | 2 | 372.5 MW |
| 2016 | 0 | 0 MW |
| 2017 | 1 | 418.9 MW |
| 2018 | 3 | 641.5 MW |
| 2019 | 1 | 200.2 MW |
| 2020 | 3 | 1.1 GW |
| 2021 | 4 | 1.8 GW |
| 2022 | 0 | 0 MW |
| 2023 | 1 | 251.3 MW |
| 2024 | 0 | 0 MW |
| 2025 | 3 | 605 MW |
| 2026 | 3 | 628.1 MW |
Changes since the June 4, 2026 snapshot
What moved in Clearway's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Clearway's pipeline moves.
Clearway against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Clearway ranks 24 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 24 | Clearway this page | 24 | 15 | 0.37 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Clearway245 people at Clearway
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 128 managers and 50 directors are where interconnection and procurement decisions start.
By seniority
245 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 4 |
| Owner | 1 |
| Partner | 2 |
| Head | 5 |
| VP | 9 |
| Director | 50 |
| Manager | 128 |
| Senior | 46 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Clearway project
All 39 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 245 contacts.
Get alerts for Clearway
We email you when Clearway adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.