CleanChoice Energy
CleanChoice Energy has 2 planned power projects totaling 44.6 MW and 1 operating project totaling 20 MW in the FieldProspects database. 44% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 2 states and 2 technologies.
Where CleanChoice Energy's planned pipeline sits
Planned MW by state. The 2 largest states hold 44.6 MW of the 44.6 MW.
Largest states
- California25 MW1 project, 56% of planned
- Pennsylvania19.6 MW1 project, 44% of planned
for every MW CleanChoice Energy operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 1 | 25 MW | 0 | 0 MW |
| Solar | 1 | 19.6 MW | 1 | 20 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of CleanChoice Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 1 | 25 MW |
| 2028 | 1 | 19.6 MW |
Pipeline by grid and queue year
CleanChoice Energy's planned MW leans on California ISO (CAISO) and PJM Interconnection. California ISO (CAISO) alone holds 56% of it.
Planned MW by grid operator
2 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 1 | 25 MW |
| PJM Interconnection | 1 | 19.6 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2020 | 1 | 19.6 MW |
Changes since the June 4, 2026 snapshot
What moved in CleanChoice Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when CleanChoice Energy's pipeline moves.
CleanChoice Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. CleanChoice Energy ranks 692 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 692 | CleanChoice Energy this page | 2 | 1 | 0.45 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus CleanChoice EnergyEvery CleanChoice Energy project
All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for CleanChoice Energy
We email you when CleanChoice Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every CleanChoice Energy project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.