Clean Shift Energy

Power developer5 projects on record Data as of

Clean Shift Energy has 3 planned power projects totaling 460 MW and 2 operating projects totaling 2.4 MW in the FieldProspects database. 8% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 3 states and 1 technology.

460MW
planned, 3 projects
2.4MW
operating, 2 projects
35MW
interconnection agreement signed, 8% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
3
states
Map

Where Clean Shift Energy's planned pipeline sits

Planned MW by state. The 2 largest states hold 460 MW of the 460 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Arizona425 MW2 projects, 92% of planned
  2. Indiana35 MW1 project, 8% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
191.7MW planned

for every MW Clean Shift Energy operates today. Solar is most of the gap.

PlannedOperating
Solar 460 MW
2.4 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar3460 MW22.4 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed35 MW, 8%
1 of 3 planned projects (33%)
Under construction0 MW, 0%
0 of 3 planned projects (0%)
Past due0 MW, 0%
0 of 3 planned projects (0%)
0% of Clean Shift Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Clean Shift Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 2026 425 MW 2027 2028
View as table
YearProjectsMW
202600 MW
20272425 MW
2028135 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Clean Shift Energy's planned MW leans on California ISO (CAISO) and PJM Interconnection. California ISO (CAISO) alone holds 92% of it.

Figure 2

Planned MW by grid operator

3 planned projects

California ISO (CAISO) 425 MW 2 projects
PJM Interconnection 35 MW 1 project
View as table
GridPlanned projectsPlanned MW
California ISO (CAISO)2425 MW
PJM Interconnection135 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

010203040 35 MW 2019
View as table
Queue yearProjectsMW
2019135 MW
Source. 2 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Clean Shift Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
1
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Clean Shift EnergyChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Clean Shift Energy's pipeline moves.

Request access

Clean Shift Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Clean Shift Energy ranks 292 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
292 Clean Shift Energy this page 3
460 MW
2
2.4 MW
0.01

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Clean Shift Energy

Every Clean Shift Energy project

All 5 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Clean Shift EnergySort: MW, largest first 5 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
5 projects and 462.4 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Clean Shift Energy

We email you when Clean Shift Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Clean Shift Energy project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.