Circle Power

Power developer1 project on record Data as of

Circle Power has 1 planned power project totaling 22.5 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 2 contacts at the company are on file.

22.5MW
planned, 1 project
0MW
operating, 0 projects
22.5MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
2
contacts on file
Map

Where Circle Power's planned pipeline sits

Planned MW by state. Everything sits in Michigan.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Michigan22.5 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
22.5 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 22.5 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar122.5 MW00 MW

MW by technologySolar has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed22.5 MW, 100%
1 of 1 planned project (100%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of Circle Power's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Circle Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0102030 Snapshot year 22.5 MW 2026
View as table
YearProjectsMW
2026122.5 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Circle Power's planned MW sits entirely in Midcontinent ISO (MISO).

Figure 2

Planned MW by grid operator

1 planned project

Midcontinent ISO (MISO) 22.5 MW 1 project
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)122.5 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

0102030 22.5 MW 2020
View as table
Queue yearProjectsMW
2020122.5 MW
Source. Every planned project has a queue date MW

Circle Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Circle Power ranks 717 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
717 Circle Power this page 1
22.5 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Circle Power

2 people at Circle Power

Contacts with title, seniority, department, email and LinkedIn, counted here and never named.

Figure 4

By seniority

2 contacts

Founder 2
View as table
SeniorityContacts
Founder2
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 2 contacts
PersonTitleDepartmentSeniorityContact
2 contacts at Circle Power for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Circle Power project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Circle PowerSort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 22.5 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 2 contacts.

Request access

Get alerts for Circle Power

We email you when Circle Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Circle Power project and the 2 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.