CIM Group
CIM Group has 5 planned power projects totaling 1.2 GW and 1 operating project totaling 40 MW in the FieldProspects database. 50% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 399 contacts at the company are on file.
Where CIM Group's planned pipeline sits
Planned MW by state. Everything sits in California.
Largest states
- California1.2 GW5 projects, 100% of planned
for every MW CIM Group operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 3 | 806.8 MW | 0 | 0 MW |
| Battery Storage | 2 | 410 MW | 1 | 40 MW |
MW by technologySolar has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of CIM Group's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 3 | 606.1 MW |
| 2028 | 2 | 610.7 MW |
Pipeline by grid and queue year
CIM Group's planned MW sits entirely in California ISO (CAISO).
Planned MW by grid operator
5 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 5 | 1.2 GW |
When the planned projects entered the queue
Planned MW by queue request year. 2016 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2016 | 2 | 610.7 MW |
Changes since the June 4, 2026 snapshot
What moved in CIM Group's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when CIM Group's pipeline moves.
CIM Group against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. CIM Group ranks 137 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 137 | CIM Group this page | 5 | 1 | 0.03 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus CIM Group399 people at CIM Group
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 122 managers and 59 directors are where interconnection and procurement decisions start.
By seniority
399 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 3 |
| Owner | 2 |
| Partner | 10 |
| Head | 15 |
| VP | 132 |
| Director | 59 |
| Manager | 122 |
| Senior | 55 |
| Entry | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every CIM Group project
All 6 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 399 contacts.
Get alerts for CIM Group
We email you when CIM Group adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every CIM Group project and the 399 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.