FieldProspects

Cielo Wind

Power developer2 projects on record Data as of

Cielo Wind has 2 planned power projects totaling 696.8 MW in the FieldProspects database and no operating project on record. 57% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 2 contacts at the company are on file.

696.8MW
planned, 2 projects
0MW
operating, 0 projects
396.8MW
interconnection agreement signed, 57% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
2
contacts on file
Map

Where Cielo Wind's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas696.8 MW2 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
696.8 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Wind 696.8 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Wind2696.8 MW00 MW

MW by technologyWind has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed396.8 MW, 57%
1 of 2 planned projects (50%)
Under construction0 MW, 0%
0 of 2 planned projects (0%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
0% of Cielo Wind's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Cielo Wind's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300400 Snapshot year 2026 2027 396.8 MW 2028 2029 2030
View as table
YearProjectsMW
202600 MW
202700 MW
20281396.8 MW
202900 MW
20301300 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Cielo Wind's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

2 planned projects

ERCOT 696.8 MW 2 projects
View as table
GridPlanned projectsPlanned MW
ERCOT2696.8 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2022 was the biggest year.

0100200300400 2021 396.8 MW 2022
View as table
Queue yearProjectsMW
20211300 MW
20221396.8 MW
Source. Every planned project has a queue date MW

Cielo Wind against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Cielo Wind ranks 230 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
230 Cielo Wind this page 2
696.8 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Cielo Wind

2 people at Cielo Wind

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 1 manager are where interconnection and procurement decisions start.

Figure 4

By seniority

2 contacts

VP 1
Manager 1
View as table
SeniorityContacts
VP1
Manager1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 2 contacts
PersonTitleDepartmentSeniorityContact
2 contacts at Cielo Wind for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Cielo Wind project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Cielo WindSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 696.8 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 2 contacts.

Request access

Get alerts for Cielo Wind

We email you when Cielo Wind adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Cielo Wind project and the 2 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.