CEP Renewables
CEP Renewables has 1 planned power project totaling 19.8 MW and 1 operating project totaling 15.4 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 14 contacts at the company are on file.
Where CEP Renewables' planned pipeline sits
Planned MW by state. Everything sits in New Jersey.
Largest states
- New Jersey19.8 MW1 project, 100% of planned
for every MW CEP Renewables operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 1 | 19.8 MW | 1 | 15.4 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of CEP Renewables' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 0 | 0 MW |
| 2028 | 1 | 19.8 MW |
Pipeline by grid and queue year
CEP Renewables' planned MW sits entirely in PJM Interconnection.
Planned MW by grid operator
1 planned project
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 1 | 19.8 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2020 | 1 | 19.8 MW |
Changes since the June 4, 2026 snapshot
What moved in CEP Renewables' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when CEP Renewables' pipeline moves.
CEP Renewables against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. CEP Renewables ranks 729 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 729 | CEP Renewables this page | 1 | 1 | 0.78 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus CEP Renewables14 people at CEP Renewables
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 6 managers and 2 directors are where interconnection and procurement decisions start.
By seniority
14 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 1 |
| VP | 5 |
| Director | 2 |
| Manager | 6 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every CEP Renewables project
All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 14 contacts.
Get alerts for CEP Renewables
We email you when CEP Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every CEP Renewables project and the 14 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.