FieldProspects

Catalyze

Power developer33 projects on record Data as of

Catalyze has 6 planned power projects totaling 10.4 MW and 27 operating projects totaling 85.9 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 77 contacts at the company are on file.

10.4MW
planned, 6 projects
85.9MW
operating, 27 projects
10.4MW
interconnection agreement signed, 100% of planned
8.1MW
under construction, 5 projects
0MW
past due, 0 projects
77
contacts on file
Map

Where Catalyze's planned pipeline sits

Planned MW by state. The 2 largest states hold 10.4 MW of the 10.4 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. California8.1 MW5 projects, 78% of planned
  2. Texas2.3 MW1 project, 22% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.1MW planned

for every MW Catalyze operates today. Battery Storage is most of the gap.

PlannedOperating
Solar 6.9 MW
84.4 MW
Battery Storage 3.5 MW
1.5 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar46.9 MW2684.4 MW
Battery Storage23.5 MW11.5 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed10.4 MW, 100%
6 of 6 planned projects (100%)
Under construction8.1 MW, 78%
5 of 6 planned projects (83%)
Past due0 MW, 0%
0 of 6 planned projects (0%)
0% of Catalyze's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Catalyze's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
051015 Snapshot year 10.4 MW 2026
View as table
YearProjectsMW
2026610.4 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Catalyze's planned MW leans on California ISO (CAISO) and ERCOT. California ISO (CAISO) alone holds 78% of it.

Figure 2

Planned MW by grid operator

6 planned projects

California ISO (CAISO) 8.1 MW 5 projects
ERCOT 2.3 MW 1 project
View as table
GridPlanned projectsPlanned MW
California ISO (CAISO)58.1 MW
ERCOT12.3 MW
Source. Balancing authorities as listed in the queue

Changes since the June 4, 2026 snapshot

What moved in Catalyze's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
2
came online
0
cancelled, inactive or dropped
2
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: CatalyzeChange: any 4 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
4 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Catalyze's pipeline moves.

Request access

Catalyze against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Catalyze ranks 748 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
748 Catalyze this page 6
10.4 MW
27
85.9 MW
8.26

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Catalyze

77 people at Catalyze

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 36 managers and 22 directors are where interconnection and procurement decisions start.

Figure 3

By seniority

77 contacts

C-Suite 5
Head 1
VP 6
Director 22
Manager 36
Senior 7
View as table
SeniorityContacts
C-Suite5
Head1
VP6
Director22
Manager36
Senior7
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 77 contacts
PersonTitleDepartmentSeniorityContact
77 contacts at Catalyze for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Catalyze project

All 33 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: CatalyzeSort: MW, largest first 33 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
33 projects and 96.3 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 77 contacts.

Request access

Get alerts for Catalyze

We email you when Catalyze adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Catalyze project and the 77 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.