Castlelake

Power developer2 projects on record Data as of

Castlelake has 2 planned power projects totaling 456.3 MW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 29 contacts at the company are on file.

456.3MW
planned, 2 projects
0MW
operating, 0 projects
0MW
interconnection agreement signed, 0% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
29
contacts on file
Map

Where Castlelake's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas456.3 MW2 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
456.3 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Battery Storage 456.3 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage2456.3 MW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed0 MW, 0%
0 of 2 planned projects (0%)
Under construction0 MW, 0%
0 of 2 planned projects (0%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
0% of Castlelake's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Castlelake's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 2026 2027 456.3 MW 2028
View as table
YearProjectsMW
202600 MW
202700 MW
20282456.3 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Castlelake's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

2 planned projects

ERCOT 456.3 MW 2 projects
View as table
GridPlanned projectsPlanned MW
ERCOT2456.3 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2023 was the biggest year.

0200400600 456.3 MW 2023
View as table
Queue yearProjectsMW
20232456.3 MW
Source. Every planned project has a queue date MW

Castlelake against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Castlelake ranks 294 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
294 Castlelake this page 2
456.3 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Castlelake

29 people at Castlelake

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 1 manager and 13 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

29 contacts

C-Suite 4
Partner 2
Head 2
Director 13
Manager 1
Senior 7
View as table
SeniorityContacts
C-Suite4
Partner2
Head2
Director13
Manager1
Senior7
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 29 contacts
PersonTitleDepartmentSeniorityContact
29 contacts at Castlelake for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Castlelake project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: CastlelakeSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 456.3 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 29 contacts.

Request access

Get alerts for Castlelake

We email you when Castlelake adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Castlelake project and the 29 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.