FieldProspects

Capital Power

Power developer5 projects on record Data as of

Capital Power has 5 planned power projects totaling 780.5 MW in the FieldProspects database and no operating project on record. 14% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 55 contacts at the company are on file.

780.5MW
planned, 5 projects
0MW
operating, 0 projects
107.5MW
interconnection agreement signed, 14% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
55
contacts on file
Map

Where Capital Power's planned pipeline sits

Planned MW by state. The 2 largest states hold 780.5 MW of the 780.5 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Oregon600 MW2 projects, 77% of planned
  2. North Carolina180.5 MW3 projects, 23% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
780.5 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 480.5 MW
none
Wind 300 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar4480.5 MW00 MW
Wind1300 MW00 MW

MW by technologySolar and Wind have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed107.5 MW, 14%
2 of 5 planned projects (40%)
Under construction0 MW, 0%
0 of 5 planned projects (0%)
Past due0 MW, 0%
0 of 5 planned projects (0%)
None of Capital Power's planned MW sits in the seven ISO queues, where 11% of planned MW is past due across all developers.

Share of Capital Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600800 Snapshot year 73 MW 2026 707.5 MW 2027
View as table
YearProjectsMW
2026173 MW
20274707.5 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Capital Power's planned MW leans on Bonneville Power Administration and Duke Energy Carolinas. Bonneville Power Administration alone holds 77% of it.

Figure 2

Planned MW by grid operator

5 planned projects

Bonneville Power Administration 600 MW 2 projects
Duke Energy Carolinas 180.5 MW 3 projects
View as table
GridPlanned projectsPlanned MW
Bonneville Power Administration2600 MW
Duke Energy Carolinas3180.5 MW
Source. Balancing authorities as listed in the queue

Changes since the June 4, 2026 snapshot

What moved in Capital Power's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
2
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Capital PowerChange: any 2 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
2 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Capital Power's pipeline moves.

Request access

Capital Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Capital Power ranks 208 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
208 Capital Power this page 5
780.5 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Capital Power

55 people at Capital Power

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 27 managers and 8 directors are where interconnection and procurement decisions start.

Figure 3

By seniority

55 contacts

C-Suite 1
VP 7
Director 8
Manager 27
Senior 12
View as table
SeniorityContacts
C-Suite1
VP7
Director8
Manager27
Senior12
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 55 contacts
PersonTitleDepartmentSeniorityContact
55 contacts at Capital Power for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Capital Power project

All 5 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Capital PowerSort: MW, largest first 5 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
5 projects and 780.5 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 55 contacts.

Request access

Get alerts for Capital Power

We email you when Capital Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Capital Power project and the 55 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.