Candela Renewables
Candela Renewables has 8 planned power projects totaling 1.7 GW and 1 operating project totaling 240 MW in the FieldProspects database. 57% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 21 contacts at the company are on file.
Where Candela Renewables' planned pipeline sits
Planned MW by state. The 2 largest states hold 1.7 GW of the 1.7 GW.
for every MW Candela Renewables operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 6 | 1.3 GW | 1 | 240 MW |
| Battery Storage | 2 | 403.8 MW | 0 | 0 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Candela Renewables' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 2 | 143.9 MW |
| 2027 | 1 | 400 MW |
| 2028 | 5 | 1.1 GW |
Pipeline by grid and queue year
Candela Renewables' planned MW leans on California ISO (CAISO) and PJM Interconnection. California ISO (CAISO) alone holds 91% of it.
Planned MW by grid operator
8 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 6 | 1.5 GW |
| PJM Interconnection | 2 | 143.9 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2019 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2016 | 1 | 49.9 MW |
| 2017 | 0 | 0 MW |
| 2018 | 0 | 0 MW |
| 2019 | 3 | 498 MW |
| 2020 | 2 | 407.6 MW |
| 2021 | 1 | 307 MW |
Changes since the June 4, 2026 snapshot
What moved in Candela Renewables' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Candela Renewables' pipeline moves.
Candela Renewables against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Candela Renewables ranks 99 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 99 | Candela Renewables this page | 8 | 1 | 0.14 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Candela Renewables21 people at Candela Renewables
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 8 managers and 7 directors are where interconnection and procurement decisions start.
By seniority
21 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 1 |
| Founder | 2 |
| VP | 2 |
| Director | 7 |
| Manager | 8 |
| Senior | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Candela Renewables project
All 9 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 21 contacts.
Get alerts for Candela Renewables
We email you when Candela Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Candela Renewables project and the 21 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.