BW Solar has 1 planned power project totaling 5 MW and 3 operating projects totaling 14.3 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 1 technology.

5MW
planned, 1 project
14.3MW
operating, 3 projects
5MW
interconnection agreement signed, 100% of planned
5MW
under construction, 1 project
0MW
past due, 0 projects
1
state
Map

Where BW Solar's planned pipeline sits

Planned MW by state. Everything sits in New York.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. New York5 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.3MW planned

for every MW BW Solar operates today.

PlannedOperating
Solar 5 MW
14.3 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar15 MW314.3 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed5 MW, 100%
1 of 1 planned project (100%)
Under construction5 MW, 100%
1 of 1 planned project (100%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of BW Solar's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of BW Solar's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0246 Snapshot year 5 MW 2026
View as table
YearProjectsMW
202615 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

BW Solar's planned MW sits entirely in New York ISO (NYISO).

Figure 2

Planned MW by grid operator

1 planned project

New York ISO (NYISO) 5 MW 1 project
View as table
GridPlanned projectsPlanned MW
New York ISO (NYISO)15 MW

BW Solar against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. BW Solar ranks 763 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
763 BW Solar this page 1
5 MW
3
14.3 MW
2.86

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus BW Solar

Every BW Solar project

All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: BW SolarSort: MW, largest first 4 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
4 projects and 19.3 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for BW Solar

We email you when BW Solar adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every BW Solar project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.