FieldProspects

Bullrock Renewables-NXTGenREA-Delaware River Solar

Power developer12 projects on record Data as of

Bullrock Renewables-NXTGenREA-Delaware River Solar has 4 planned power projects totaling 12 MW and 8 operating projects totaling 29.1 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date.

12MW
planned, 4 projects
29.1MW
operating, 8 projects
12MW
interconnection agreement signed, 100% of planned
12MW
under construction, 4 projects
0MW
past due, 0 projects
2
states
Map

Where Bullrock Renewables-NXTGenREA-Delaware River Solar's planned pipeline sits

Planned MW by state. Everything sits in Minnesota.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Minnesota12 MW4 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.4MW planned

for every MW Bullrock Renewables-NXTGenREA-Delaware River Solar operates today.

PlannedOperating
Solar 12 MW
29.1 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar412 MW829.1 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed12 MW, 100%
4 of 4 planned projects (100%)
Under construction12 MW, 100%
4 of 4 planned projects (100%)
Past due0 MW, 0%
0 of 4 planned projects (0%)
0% of Bullrock Renewables-NXTGenREA-Delaware River Solar's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Bullrock Renewables-NXTGenREA-Delaware River Solar's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
051015 Snapshot year 12 MW 2026
View as table
YearProjectsMW
2026412 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Bullrock Renewables-NXTGenREA-Delaware River Solar's planned MW sits entirely in Midcontinent ISO (MISO).

Figure 2

Planned MW by grid operator

4 planned projects

Midcontinent ISO (MISO) 12 MW 4 projects
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)412 MW

Changes since the June 4, 2026 snapshot

What moved in Bullrock Renewables-NXTGenREA-Delaware River Solar's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+4
projects added, 12 MW
0
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Bullrock Renewables-NXTGenREA-Delaware River SolarChange: any 4 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
4 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Bullrock Renewables-NXTGenREA-Delaware River Solar's pipeline moves.

Request access

Bullrock Renewables-NXTGenREA-Delaware River Solar against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Bullrock Renewables-NXTGenREA-Delaware River Solar ranks 746 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
746 Bullrock Renewables-NXTGenREA-Delaware River Solar this page 4
12 MW
8
29.1 MW
2.43

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Bullrock Renewables-NXTGenREA-Delaware River Solar

Every Bullrock Renewables-NXTGenREA-Delaware River Solar project

All 12 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Bullrock Renewables-NXTGenREA-Delaware River SolarSort: MW, largest first 12 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
12 projects and 41.1 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Bullrock Renewables-NXTGenREA-Delaware River Solar

We email you when Bullrock Renewables-NXTGenREA-Delaware River Solar adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Bullrock Renewables-NXTGenREA-Delaware River Solar project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.