Brookfield
Brookfield has 4 planned power projects totaling 210.2 MW and 5 operating projects totaling 347 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. It also has 1 data center record.
Where Brookfield's planned pipeline sits
Planned MW by state. The 2 largest states hold 210.2 MW of the 210.2 MW.
Largest states
- California160 MW3 projects, 76% of planned
- Connecticut50.2 MW1 project, 24% of planned
for every MW Brookfield operates today. Wind is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Wind | 3 | 160 MW | 3 | 87 MW |
| Solar | 1 | 50.2 MW | 1 | 80 MW |
| Battery Storage | 0 | 0 MW | 1 | 180 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Brookfield's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 3 | 160 MW |
| 2027 | 0 | 0 MW |
| 2028 | 0 | 0 MW |
| 2029 | 0 | 0 MW |
| 2030 | 1 | 50.2 MW |
Pipeline by grid and queue year
Brookfield's planned MW leans on California ISO (CAISO) and ISO New England. California ISO (CAISO) alone holds 76% of it.
Planned MW by grid operator
4 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 3 | 160 MW |
| ISO New England | 1 | 50.2 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2018 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2016 | 1 | 20 MW |
| 2017 | 0 | 0 MW |
| 2018 | 1 | 60 MW |
| 2019 | 0 | 0 MW |
| 2020 | 0 | 0 MW |
| 2021 | 1 | 50.2 MW |
Changes since the June 4, 2026 snapshot
What moved in Brookfield's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Brookfield's pipeline moves.
Brookfield against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Brookfield ranks 460 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 460 | Brookfield this page | 4 | 5 | 1.65 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus BrookfieldEvery Brookfield project
All 9 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Brookfield
We email you when Brookfield adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Brookfield project, with its county, dates and queue status.