BQ Energy Development
BQ Energy Development has 4 planned power projects totaling 317 MW and 3 operating projects totaling 10.8 MW in the FieldProspects database. 80% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 2 contacts at the company are on file.
Where BQ Energy Development's planned pipeline sits
Planned MW by state. The 3 largest states hold 317 MW of the 317 MW.
for every MW BQ Energy Development operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 3 | 163 MW | 3 | 10.8 MW |
| Battery Storage | 1 | 154 MW | 0 | 0 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of BQ Energy Development's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 100 MW |
| 2027 | 3 | 217 MW |
Pipeline by grid and queue year
BQ Energy Development's planned MW leans on ERCOT, PJM Interconnection and Louisville Gas & Electric / Kentucky Utilities. ERCOT alone holds 49% of it.
Planned MW by grid operator
4 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 1 | 154 MW |
| PJM Interconnection | 2 | 143 MW |
| Louisville Gas & Electric / Kentucky Utilities | 1 | 20 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2022 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2022 | 1 | 154 MW |
Changes since the June 4, 2026 snapshot
What moved in BQ Energy Development's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when BQ Energy Development's pipeline moves.
BQ Energy Development against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. BQ Energy Development ranks 369 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 369 | BQ Energy Development this page | 4 | 3 | 0.03 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus BQ Energy Development2 people at BQ Energy Development
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 1 manager and 1 director are where interconnection and procurement decisions start.
By seniority
2 contacts
View as table
| Seniority | Contacts |
|---|---|
| Director | 1 |
| Manager | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every BQ Energy Development project
All 7 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 2 contacts.
Get alerts for BQ Energy Development
We email you when BQ Energy Development adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every BQ Energy Development project and the 2 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.