FieldProspects

BQ Energy Development

Power developer7 projects on record Data as of

BQ Energy Development has 4 planned power projects totaling 317 MW and 3 operating projects totaling 10.8 MW in the FieldProspects database. 80% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 2 contacts at the company are on file.

317MW
planned, 4 projects
10.8MW
operating, 3 projects
254MW
interconnection agreement signed, 80% of planned
100MW
under construction, 1 project
0MW
past due, 0 projects
2
contacts on file
Map

Where BQ Energy Development's planned pipeline sits

Planned MW by state. The 3 largest states hold 317 MW of the 317 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas154 MW1 project, 49% of planned
  2. Ohio143 MW2 projects, 45% of planned
  3. Virginia20 MW1 project, 6% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
29.4MW planned

for every MW BQ Energy Development operates today. Battery Storage is most of the gap.

PlannedOperating
Solar 163 MW
10.8 MW
Battery Storage 154 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar3163 MW310.8 MW
Battery Storage1154 MW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed254 MW, 80%
2 of 4 planned projects (50%)
Under construction100 MW, 32%
1 of 4 planned projects (25%)
Past due0 MW, 0%
0 of 4 planned projects (0%)
0% of BQ Energy Development's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of BQ Energy Development's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300 Snapshot year 100 MW 2026 217 MW 2027
View as table
YearProjectsMW
20261100 MW
20273217 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

BQ Energy Development's planned MW leans on ERCOT, PJM Interconnection and Louisville Gas & Electric / Kentucky Utilities. ERCOT alone holds 49% of it.

Figure 2

Planned MW by grid operator

4 planned projects

ERCOT 154 MW 1 project
PJM Interconnection 143 MW 2 projects
Louisville Gas & Electric / Kentucky Utilities 20 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT1154 MW
PJM Interconnection2143 MW
Louisville Gas & Electric / Kentucky Utilities120 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2022 was the biggest year.

050100150200 154 MW 2022
View as table
Queue yearProjectsMW
20221154 MW
Source. 3 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in BQ Energy Development's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
1
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: BQ Energy DevelopmentChange: any 3 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
3 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when BQ Energy Development's pipeline moves.

Request access

BQ Energy Development against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. BQ Energy Development ranks 369 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
369 BQ Energy Development this page 4
317 MW
3
10.8 MW
0.03

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus BQ Energy Development

2 people at BQ Energy Development

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 1 manager and 1 director are where interconnection and procurement decisions start.

Figure 4

By seniority

2 contacts

Director 1
Manager 1
View as table
SeniorityContacts
Director1
Manager1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 2 contacts
PersonTitleDepartmentSeniorityContact
2 contacts at BQ Energy Development for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every BQ Energy Development project

All 7 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: BQ Energy DevelopmentSort: MW, largest first 7 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
7 projects and 327.8 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 2 contacts.

Request access

Get alerts for BQ Energy Development

We email you when BQ Energy Development adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every BQ Energy Development project and the 2 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.