FieldProspects

BNRG Renewables

Power developer3 projects on record Data as of

BNRG Renewables has 3 planned power projects totaling 100 MW in the FieldProspects database and no operating project on record. 95% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 13 contacts at the company are on file.

100MW
planned, 3 projects
0MW
operating, 0 projects
95MW
interconnection agreement signed, 95% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
13
contacts on file
Map

Where BNRG Renewables' planned pipeline sits

Planned MW by state. The 2 largest states hold 100 MW of the 100 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Indiana75 MW1 project, 75% of planned
  2. Maine25 MW2 projects, 25% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
100 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 100 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar3100 MW00 MW

MW by technologySolar has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed95 MW, 95%
2 of 3 planned projects (67%)
Under construction0 MW, 0%
0 of 3 planned projects (0%)
Past due0 MW, 0%
0 of 3 planned projects (0%)
0% of BNRG Renewables' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of BNRG Renewables' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0255075100 Snapshot year 2026 2027 100 MW 2028
View as table
YearProjectsMW
202600 MW
202700 MW
20283100 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

BNRG Renewables' planned MW leans on PJM Interconnection and ISO New England. PJM Interconnection alone holds 75% of it.

Figure 2

Planned MW by grid operator

3 planned projects

PJM Interconnection 75 MW 1 project
ISO New England 25 MW 2 projects
View as table
GridPlanned projectsPlanned MW
PJM Interconnection175 MW
ISO New England225 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

0255075100 95 MW 2020
View as table
Queue yearProjectsMW
2020295 MW
Source. 1 project without a queue date is left out MW

Changes since the June 4, 2026 snapshot

What moved in BNRG Renewables' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
1
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: BNRG RenewablesChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when BNRG Renewables' pipeline moves.

Request access

BNRG Renewables against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. BNRG Renewables ranks 622 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
622 BNRG Renewables this page 3
100 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus BNRG Renewables

13 people at BNRG Renewables

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 11 managers are where interconnection and procurement decisions start.

Figure 4

By seniority

13 contacts

Head 2
Manager 11
View as table
SeniorityContacts
Head2
Manager11
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 13 contacts
PersonTitleDepartmentSeniorityContact
13 contacts at BNRG Renewables for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every BNRG Renewables project

All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: BNRG RenewablesSort: MW, largest first 3 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
3 projects and 100 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 13 contacts.

Request access

Get alerts for BNRG Renewables

We email you when BNRG Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every BNRG Renewables project and the 13 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.