FieldProspects

Bluestar Energy Capital

Power developer2 projects on record Data as of

Bluestar Energy Capital has 2 planned power projects totaling 779.9 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 5 contacts at the company are on file.

779.9MW
planned, 2 projects
0MW
operating, 0 projects
779.9MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
5
contacts on file
Map

Where Bluestar Energy Capital's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas779.9 MW2 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
779.9 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 503.1 MW
none
Wind 276.8 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar1503.1 MW00 MW
Wind1276.8 MW00 MW

MW by technologySolar and Wind have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed779.9 MW, 100%
2 of 2 planned projects (100%)
Under construction0 MW, 0%
0 of 2 planned projects (0%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
0% of Bluestar Energy Capital's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Bluestar Energy Capital's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 2026 2027 503.1 MW 2028
View as table
YearProjectsMW
202600 MW
20271276.8 MW
20281503.1 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Bluestar Energy Capital's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

2 planned projects

ERCOT 779.9 MW 2 projects
View as table
GridPlanned projectsPlanned MW
ERCOT2779.9 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2025 was the biggest year.

0200400600 2022 2023 2024 503.1 MW 2025
View as table
Queue yearProjectsMW
20221276.8 MW
202300 MW
202400 MW
20251503.1 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in Bluestar Energy Capital's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Bluestar Energy CapitalChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Bluestar Energy Capital's pipeline moves.

Request access

Bluestar Energy Capital against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Bluestar Energy Capital ranks 209 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
209 Bluestar Energy Capital this page 2
779.9 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Bluestar Energy Capital

5 people at Bluestar Energy Capital

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 2 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

5 contacts

Founder 1
Director 2
Senior 2
View as table
SeniorityContacts
Founder1
Director2
Senior2
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 5 contacts
PersonTitleDepartmentSeniorityContact
5 contacts at Bluestar Energy Capital for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Bluestar Energy Capital project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Bluestar Energy CapitalSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 779.9 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 5 contacts.

Request access

Get alerts for Bluestar Energy Capital

We email you when Bluestar Energy Capital adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Bluestar Energy Capital project and the 5 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.