BluEarth Renewables
BluEarth Renewables has 2 planned power projects totaling 253.1 MW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 7 contacts at the company are on file.
Where BluEarth Renewables' planned pipeline sits
Planned MW by state. The 2 largest states hold 253.1 MW of the 253.1 MW.
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Wind | 2 | 253.1 MW | 0 | 0 MW |
MW by technologyWind has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of BluEarth Renewables' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 0 | 0 MW |
| 2028 | 1 | 6.1 MW |
| 2029 | 1 | 247 MW |
Pipeline by grid and queue year
BluEarth Renewables' planned MW leans on Associated Electric Cooperative and PacifiCorp East. Associated Electric Cooperative alone holds 98% of it.
Planned MW by grid operator
2 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Associated Electric Cooperative | 1 | 247 MW |
| PacifiCorp East | 1 | 6.1 MW |
BluEarth Renewables against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. BluEarth Renewables ranks 425 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 425 | BluEarth Renewables this page | 2 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus BluEarth Renewables7 people at BluEarth Renewables
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 4 managers and 1 director are where interconnection and procurement decisions start.
By seniority
7 contacts
View as table
| Seniority | Contacts |
|---|---|
| VP | 1 |
| Director | 1 |
| Manager | 4 |
| Senior | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every BluEarth Renewables project
All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 7 contacts.
Get alerts for BluEarth Renewables
We email you when BluEarth Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every BluEarth Renewables project and the 7 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.