BluEarth Renewables

Power developer2 projects on record Data as of

BluEarth Renewables has 2 planned power projects totaling 253.1 MW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 7 contacts at the company are on file.

253.1MW
planned, 2 projects
0MW
operating, 0 projects
0MW
interconnection agreement signed, 0% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
7
contacts on file
Map

Where BluEarth Renewables' planned pipeline sits

Planned MW by state. The 2 largest states hold 253.1 MW of the 253.1 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Missouri247 MW1 project, 98% of planned
  2. Wyoming6.1 MW1 project, 2% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
253.1 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Wind 253.1 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Wind2253.1 MW00 MW

MW by technologyWind has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed0 MW, 0%
0 of 2 planned projects (0%)
Under construction0 MW, 0%
0 of 2 planned projects (0%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
None of BluEarth Renewables' planned MW sits in the seven ISO queues, where 11% of planned MW is past due across all developers.

Share of BluEarth Renewables' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300 Snapshot year 2026 2027 2028 247 MW 2029
View as table
YearProjectsMW
202600 MW
202700 MW
202816.1 MW
20291247 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

BluEarth Renewables' planned MW leans on Associated Electric Cooperative and PacifiCorp East. Associated Electric Cooperative alone holds 98% of it.

Figure 2

Planned MW by grid operator

2 planned projects

Associated Electric Cooperative 247 MW 1 project
PacifiCorp East 6.1 MW 1 project
View as table
GridPlanned projectsPlanned MW
Associated Electric Cooperative1247 MW
PacifiCorp East16.1 MW
Source. Balancing authorities as listed in the queue

BluEarth Renewables against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. BluEarth Renewables ranks 425 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
425 BluEarth Renewables this page 2
253.1 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus BluEarth Renewables

7 people at BluEarth Renewables

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 4 managers and 1 director are where interconnection and procurement decisions start.

Figure 3

By seniority

7 contacts

VP 1
Director 1
Manager 4
Senior 1
View as table
SeniorityContacts
VP1
Director1
Manager4
Senior1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 7 contacts
PersonTitleDepartmentSeniorityContact
7 contacts at BluEarth Renewables for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every BluEarth Renewables project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: BluEarth RenewablesSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 253.1 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 7 contacts.

Request access

Get alerts for BluEarth Renewables

We email you when BluEarth Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every BluEarth Renewables project and the 7 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.