Blue Ridge Energy Holdings

Power developer4 projects on record Data as of

Blue Ridge Energy Holdings has 1 planned power project totaling 200 MW and 3 operating projects totaling 54.4 MW in the FieldProspects database. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date.

200MW
planned, 1 project
54.4MW
operating, 3 projects
0MW
interconnection agreement signed, 0% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
2
states
Map

Where Blue Ridge Energy Holdings' planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas200 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
3.7MW planned

for every MW Blue Ridge Energy Holdings operates today. Hybrid is most of the gap.

PlannedOperating
Hybrid 200 MW
none
Solar none
54.4 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Hybrid1200 MW00 MW
Solar00 MW354.4 MW

MW by technologyHybrid has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed0 MW, 0%
0 of 1 planned project (0%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of Blue Ridge Energy Holdings' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Blue Ridge Energy Holdings' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 2026 2027 2028 200 MW 2029
View as table
YearProjectsMW
202600 MW
202700 MW
202800 MW
20291200 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Blue Ridge Energy Holdings' planned MW sits entirely in Southwest Power Pool (SPP).

Figure 2

Planned MW by grid operator

1 planned project

Southwest Power Pool (SPP) 200 MW 1 project
View as table
GridPlanned projectsPlanned MW
Southwest Power Pool (SPP)1200 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2023 was the biggest year.

050100150200 200 MW 2023
View as table
Queue yearProjectsMW
20231200 MW
Source. Every planned project has a queue date MW

Blue Ridge Energy Holdings against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Blue Ridge Energy Holdings ranks 516 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
516 Blue Ridge Energy Holdings this page 1
200 MW
3
54.4 MW
0.27

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Blue Ridge Energy Holdings

Every Blue Ridge Energy Holdings project

All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Blue Ridge Energy HoldingsSort: MW, largest first 4 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
4 projects and 254.4 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Blue Ridge Energy Holdings

We email you when Blue Ridge Energy Holdings adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Blue Ridge Energy Holdings project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.